Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

149

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Dog and cat food manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
NL0134 #07 Y:2026 Utilize energy-efficient belts and other improved mechanisms $788 $827
NL0134 #06 Y:2026 Eliminate leaks in inert gas and compressed air lines/ valves $1,158 $1,000
NL0134 #05 Y:2026 Install compressor air intakes in coolest locations $1,224 $1,840
NL0134 #04 Y:2026 Install occupancy sensors $4,353 $5,193
NL0134 #03 Y:2026 Recharge batteries on during off-peak demand periods $6,272 $500
NL0134 #02 Y:2026 Recover and reuse waste material $10,725 $10,400
NL0134 #01 Y:2026 Meter recycled water (to reduce sewer charges) $90,322 $5,410
AM0913 #08 Y:2024 Insulate bare equipment $2,610 $415
AM0913 #07 Y:2024 Reduce the pressure of compressed air to the minimum required $4,000 $15
AM0913 #06 Y:2024 Utilize energy-efficient belts and other improved mechanisms $5,090 -
AM0913 #05 Y:2024 Optimize plant power factor $10,340 $19,040
AM0913 #04 Y:2024 Repair or replace steam traps $12,600 $2,200
AM0913 #03 Y:2024 Eliminate leaks in inert gas and compressed air lines/ valves $48,970 $2,000
AM0913 #02 Y:2024 Apply for tax-free status for energy purchases $430,200 $10,000
AM0913 #01 Y:2024 Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat $206,260 $1,610,000
SD0633 #09 Y:2023 Use adjustable frequency drive or multiple speed motors on existing system $1,740 $4,578
SD0633 #08 Y:2023 Use most efficient equipment at it's maximum capacity and less efficient equipment only when necessary $102,944 -
SD0633 #07 Y:2023 Use most efficient type of electric motors $28,972 $66,845
SD0633 #06 Y:2023 Use solar heat to make electricty $219,112 $395,439
SD0633 #05 Y:2023 Reduce the pressure of compressed air to the minimum required $1,338 $500