Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

566

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Animal food manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
NL0134 #07 Y:2026 Utilize energy-efficient belts and other improved mechanisms $788 $827
NL0134 #06 Y:2026 Eliminate leaks in inert gas and compressed air lines/ valves $1,158 $1,000
NL0134 #05 Y:2026 Install compressor air intakes in coolest locations $1,224 $1,840
NL0134 #04 Y:2026 Install occupancy sensors $4,353 $5,193
NL0134 #03 Y:2026 Recharge batteries on during off-peak demand periods $6,272 $500
NL0134 #02 Y:2026 Recover and reuse waste material $10,725 $10,400
NL0134 #01 Y:2026 Meter recycled water (to reduce sewer charges) $90,322 $5,410
LE0607 #08 Y:2025 Use solar heat to heat water $77,719 $1,202,256
LE0607 #07 Y:2025 Preheat combustion air with waste heat $4,854 $10,000
LE0607 #06 Y:2025 Repair or replace steam traps $3,892 $4,700
LE0607 #05 Y:2025 Use adjustable frequency drive or multiple speed motors on existing system $24,953 $13,000
LE0607 #04 Y:2025 Upgrade obsolete equipment $833,198 $400,000
LE0607 #03 Y:2025 Re-arrange equipment layout to reduce handling costs $1,005,000 $1,000,000
LE0607 #02 Y:2025 Use / purchase optimum sized compressor $138,699 $35,000
LE0607 #01 Y:2025 Reduce the pressure of compressed air to the minimum required $2,048 -
NL0125 #06 Y:2025 Eliminate leaks in inert gas and compressed air lines/ valves $2,881 $3,000
NL0125 #05 Y:2025 Use waste heat from hot flue gases to preheat $184,176 $1,561,000
NL0125 #04 Y:2025 Use continuous processing $515,427 $123,656
NL0125 #03 Y:2025 Reduce fluid flow rates $862,950 $672,300
NL0125 #02 Y:2025 Add/modify equipment to improve drying process $150,000 $1,200,000