10,035
matching recommendations| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| SU0580 #01 Y:2025 | 01 | 2025 | Reschedule plant operations or reduce load to avoid peaks | $2,986 | - |
n/a
|
| UF0636 #12 Y:2025 | 12 | 2025 | Meter recycled water (to reduce sewer charges) | $71,586 | $4,000 |
n/a
|
| UF0636 #11 Y:2025 | 11 | 2025 | Replace existing equipment with more suitable substitutes | $29,400 | $2,792 |
n/a
|
| UF0636 #10 Y:2025 | 10 | 2025 | Level zero – install control systems for existing equipment | $45,922 | $60,000 |
n/a
|
| UF0636 #09 Y:2025 | 09 | 2025 | Utilize energy-efficient belts and other improved mechanisms | $2,852 | - |
n/a
|
| UF0636 #08 Y:2025 | 08 | 2025 | Improve combustion control capability | $4,064 | $2,800 |
n/a
|
| UF0636 #07 Y:2025 | 07 | 2025 | Install turbulators | $4,892 | $7,500 |
n/a
|
| UF0636 #06 Y:2025 | 06 | 2025 | Reduce the pressure of compressed air to the minimum required | $7,364 | - |
n/a
|
| UF0636 #05 Y:2025 | 05 | 2025 | Utilize controls to operate equipment only when needed | $7,674 | $25,280 |
n/a
|
| UF0636 #04 Y:2025 | 04 | 2025 | Utilize higher efficiency lamps and/or ballasts | $14,820 | $29,969 |
n/a
|
| UF0636 #03 Y:2025 | 03 | 2025 | Use most efficient type of electric motors | $37,528 | $29,400 |
n/a
|
| UF0636 #02 Y:2025 | 02 | 2025 | Use demand controller or load shedder | $46,721 | $47,512 |
n/a
|
| UF0636 #01 Y:2025 | 01 | 2025 | Use waste heat with a closed-cycle gas turbine-generator set to cogenerate electricity and heat | $569,031 | $1,748,460 |
n/a
|
| IP0215 #11 Y:2025 | 11 | 2025 | Use proper thickness of insulation on building envelope | $1,206 | $2,279 |
n/a
|
| IP0215 #10 Y:2025 | 10 | 2025 | Optimize plant power factor | $26,556 | $45,576 |
n/a
|
| IP0215 #09 Y:2025 | 09 | 2025 | Use heat from boiler blowdown to preheat boiler feed water | $10,982 | $16,152 |
n/a
|
| IP0215 #08 Y:2025 | 08 | 2025 | Install compressor air intakes in coolest locations | $5,523 | $960 |
n/a
|
| IP0215 #07 Y:2025 | 07 | 2025 | Replace hydraulic / pneumatic equipment with electric equipment | $58,146 | $9,960 |
n/a
|
| IP0215 #06 Y:2025 | 06 | 2025 | Recover waste heat from equipment | $33,297 | $5,271 |
n/a
|
| IP0215 #05 Y:2025 | 05 | 2025 | Reduce illumination to minimum necessary levels | $2,235 | $276 |
n/a
|