Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

10,035

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Food manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
SU0580 #01 Y:2025 Reschedule plant operations or reduce load to avoid peaks $2,986 -
UF0636 #12 Y:2025 Meter recycled water (to reduce sewer charges) $71,586 $4,000
UF0636 #11 Y:2025 Replace existing equipment with more suitable substitutes $29,400 $2,792
UF0636 #10 Y:2025 Level zero – install control systems for existing equipment $45,922 $60,000
UF0636 #09 Y:2025 Utilize energy-efficient belts and other improved mechanisms $2,852 -
UF0636 #08 Y:2025 Improve combustion control capability $4,064 $2,800
UF0636 #07 Y:2025 Install turbulators $4,892 $7,500
UF0636 #06 Y:2025 Reduce the pressure of compressed air to the minimum required $7,364 -
UF0636 #05 Y:2025 Utilize controls to operate equipment only when needed $7,674 $25,280
UF0636 #04 Y:2025 Utilize higher efficiency lamps and/or ballasts $14,820 $29,969
UF0636 #03 Y:2025 Use most efficient type of electric motors $37,528 $29,400
UF0636 #02 Y:2025 Use demand controller or load shedder $46,721 $47,512
UF0636 #01 Y:2025 Use waste heat with a closed-cycle gas turbine-generator set to cogenerate electricity and heat $569,031 $1,748,460
IP0215 #11 Y:2025 Use proper thickness of insulation on building envelope $1,206 $2,279
IP0215 #10 Y:2025 Optimize plant power factor $26,556 $45,576
IP0215 #09 Y:2025 Use heat from boiler blowdown to preheat boiler feed water $10,982 $16,152
IP0215 #08 Y:2025 Install compressor air intakes in coolest locations $5,523 $960
IP0215 #07 Y:2025 Replace hydraulic / pneumatic equipment with electric equipment $58,146 $9,960
IP0215 #06 Y:2025 Recover waste heat from equipment $33,297 $5,271
IP0215 #05 Y:2025 Reduce illumination to minimum necessary levels $2,235 $276