Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

10,035

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Food manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
WV0342 #16 Y:2006 Reduce illumination to minimum necessary levels $2,240 $93
WV0342 #15 Y:2006 Utilize energy-efficient belts and other improved mechanisms $3,938 -
WV0342 #14 Y:2006 Reduce the pressure of compressed air to the minimum required $6,759 $35
WV0342 #13 Y:2006 Develop a repair/replace policy $11,020 $1,348
WV0342 #12 Y:2006 Analyze flue gas for proper air/fuel ratio $15,068 $1,000
WV0342 #11 Y:2006 Insulate bare equipment $18,125 $2,570
WV0342 #10 Y:2006 Use synthetic lubricant $23,049 $280
WV0342 #09 Y:2006 Reschedule plant operations or reduce load to avoid peaks $26,439 $2,700
WV0342 #08 Y:2006 Establish a predictive maintenance program $26,961 $1,000
WV0342 #07 Y:2006 Operate boilers on high fire setting $41,893 $112,000
WV0342 #06 Y:2006 Direct warmest air to combustion intake $74,909 $77,050
WV0342 #05 Y:2006 Preheat combustion air with waste heat $76,391 $42,250
WV0342 #04 Y:2006 Reduce excessive boiler blowdown $87,693 $208,500
WV0342 #03 Y:2006 Increase amount of condensate returned $103,142 $100,000
WV0342 #02 Y:2006 Use / purchase optimum sized compressor $124,707 $188,500
WV0342 #01 Y:2006 Repair or replace steam traps $151,419 $4,500
LL0248 #08 Y:2006 Install timers and/or thermostats $320 $50
LL0248 #07 Y:2006 Utilize higher efficiency lamps and/or ballasts $619 $150
LL0248 #06 Y:2006 Replace existing equipment with more suitable substitutes $900 $300
LL0248 #05 Y:2006 Eliminate leaks in inert gas and compressed air lines/ valves $959 $151