Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

10,025

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Food manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
SF0333 #12 Y:2006 Use waste heat from hot flue gases to preheat $4,895 $10,000
SF0333 #11 Y:2006 Eliminate leaks in inert gas and compressed air lines/ valves $667 $1,280
SF0333 #10 Y:2006 Utilize energy-efficient belts and other improved mechanisms $642 $1,153
SF0333 #09 Y:2006 Use adjustable frequency drive or multiple speed motors on existing system $8,235 $12,934
SF0333 #08 Y:2006 Utilize daylight whenever possible in lieu of artificial light $3,123 $5,680
SF0333 #07 Y:2006 Change rate schedules or other changes in utility service $22,820 $20,775
SF0333 #06 Y:2006 Use adjustable frequency drive or multiple speed motors on existing system $22,924 $17,809
SF0333 #05 Y:2006 Use most efficient type of electric motors $9,301 $4,440
SF0333 #04 Y:2006 Install / repair insulation on steam lines $1,439 $600
SF0333 #03 Y:2006 Eliminate or reduce compressed air usage $13,592 $4,815
SF0333 #02 Y:2006 Use compressor air filters $3,806 $1,200
SF0333 #01 Y:2006 Utilize a less expensive cooling method $65,964 $9,840
GT0827 #10 Y:2006 Eliminate leaks in inert gas and compressed air lines/ valves $9,887 $3,400
GT0827 #09 Y:2006 Recover waste heat from equipment $158,948 $150,000
GT0827 #08 Y:2006 Meter waste water $81,583 $5,250
GT0827 #07 Y:2006 Minimize operation of equipment maintained in standby condition $2,734 $3,500
GT0827 #06 Y:2006 Utilize higher efficiency lamps and/or ballasts $2,361 $2,328
GT0827 #05 Y:2006 Utilize higher efficiency lamps and/or ballasts $2,421 $4,053
GT0827 #04 Y:2006 Reduce excess steam bleeding $10,400 $39,900
GT0827 #03 Y:2006 Use steam condensate for hot water supply (non-potable) $85,490 $12,500