Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

657

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Water supply and irrigation systems
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
IP0077 #08 Y:2016 Replace electrically-operated equipment with fossil fuel equipment $14,841 $51,853
IP0077 #07 Y:2016 Lower temperature during the winter season and vice-versa $2,360 $2,970
IP0077 #06 Y:2016 Install occupancy sensors $1,389 $1,583
IP0077 #05 Y:2016 Utilize higher efficiency lamps and/or ballasts $3,269 $3,424
IP0077 #04 Y:2016 Utilize energy-efficient belts and other improved mechanisms $252 $190
IP0077 #03 Y:2016 Utilize higher efficiency lamps and/or ballasts $50 $37
IP0077 #02 Y:2016 Reduce illumination to minimum necessary levels $475 $150
IP0077 #01 Y:2016 Reduce ventilation air $808 $30
MA0763 #07 Y:2016 Improve air circulation with destratification fans / other methods $940 $3,880
MA0763 #06 Y:2016 Use most efficient equipment at it's maximum capacity and less efficient equipment only when necessary $1,753 $1,000
MA0763 #05 Y:2016 Pay utility bills on time $2,873 $500
MA0763 #04 Y:2016 Utilize higher efficiency lamps and/or ballasts $3,321 $5,078
MA0763 #03 Y:2016 Eliminate or reduce compressed air usage $4,665 $4,950
MA0763 #02 Y:2016 Use existing dam to generate electricity $14,909 $68,625
MA0763 #01 Y:2016 Replace electrically-operated equipment with fossil fuel equipment $18,953 $37,590
IA0561 #06 Y:2016 Use adjustable frequency drive or multiple speed motors on existing system $2,225 $5,350
IA0561 #05 Y:2016 Reduce the pressure of compressed air to the minimum required $504 $70
IA0561 #04 Y:2016 Utilize sensors controlling roof and wall openings $533 $195
IA0561 #03 Y:2016 Eliminate leaks in inert gas and compressed air lines/ valves $1,312 $560
IA0561 #02 Y:2016 Install occupancy sensors $1,633 $944