| Assessment Year | 2016 |
|---|---|
| Principal Product | Treated drinking water |
| NAICS | 221310: Water Supply and Irrigation Systems |
| SIC | 4941: Water Supply |
| Sales Range | $1 M to 5M |
| # of Employees | 40 |
| Plant Area |
45,000
ft2
|
| Annual Production | 365,000
Tgal
|
| Production Hrs. Annual | 2,502
hrs
|
| Location (State) | Connecticut |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $260,892 | 2,795,450 |
kWh
|
$0.093 |
| Electricity Demand | $107,996 | 16,853 |
kW-mo/yr
|
$6.41 |
| Electricity Fees | $7,019 | - |
|
- |
| Fuel Oil #2 | $31,138 | 2,534 |
MMBtu
|
$12.29 |
| TOTAL YEARLY COSTS | $407,045 | |||
| RECOMMENDED SAVINGS* | $47,414 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $26,900 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | LPG Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $18,953 | $37,590 |
$39,070
418,623
kWh
|
- | - |
$(-20,117.0)
-
MMBtu
|
|
| 02 | 2.3322: Use existing dam to generate electricity | $14,909 | $68,625 |
$13,627
146,056
kWh
|
$1,282
-
kW-mo/yr
|
- | - | |
| 03 | 2.4239: Eliminate or reduce compressed air usage | $4,665 | $4,950 |
$4,665
49,997
kWh
|
- | - | - | |
| 04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,321 | $5,078 |
$3,321
35,596
kWh
|
- | - | - | |
| 05 | 2.8123: Pay utility bills on time | $2,873 | $500 | - | - | $2,873 | - | |
| 06 | 2.6221: Use most efficient equipment at it's maximum capacity and less efficient equipment only when necessary | $1,753 | $1,000 |
$1,753
18,786
kWh
|
- | - | - | |
| 07 | 2.7243: Improve air circulation with destratification fans / other methods | $940 | $3,880 |
$940
10,059
kWh
|
- | - | - | |
| TOTAL RECOMMENDED | $47,414 | $121,623 |
$63,376
679,117
kWh
|
$1,282
-
kW-mo/yr
|
$2,873 |
$(-20,117.0)
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $26,900 | $44,168 |
$44,144
473,005
kWh
|
- | $2,873 |
$(-20,117.0)
-
MMBtu
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | LPG Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs