ITAC Assessment: LE0546
ITAC logo
ITAC Assessment: LE0546
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product Generic Drugs
NAICS 325412: Pharmaceutical Preparation Manufacturing
SIC 2834: Pharmaceutical Preparations
Sales Range $50
M
to 100
M
# of Employees 400
Plant Area 110,000
ft2
Annual Production 100,000
ton
Production Hrs. Annual 5,928
hrs
Location (State) Pennsylvania

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,624,123 18,232,286
kWh
Electricity Demand $209,600 34,421
kW-mo/yr
Electricity Fees $56,701 -
Natural Gas $497,848 47,505
MMBtu
TOTAL YEARLY COSTS $2,388,272
RECOMMENDED SAVINGS* $170,476 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $14,482 $4,500 $11,704
131,505
kWh
$2,778
-
kW-mo/yr
-
02 2.6212: Turn off equipment during breaks, reduce operating time $43,220 $20,000 - - $43,220
-
MMBtu
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $30,997 $20,300 $27,227
305,919
kWh
$3,770
-
kW-mo/yr
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $39,746 $72,400 $34,809
391,116
kWh
$4,937
-
kW-mo/yr
-
05 2.4221: Install compressor air intakes in coolest locations $1,099 $2,000 $965
10,849
kWh
$134
-
kW-mo/yr
-
06 2.4226: Use / purchase optimum sized compressor $14,194 $40,000 $12,464
140,039
kWh
$1,730
-
kW-mo/yr
-
07 2.7261: Install timers and/or thermostats $15,770 $50,000 $11,951
134,284
kWh
$3,819
-
kW-mo/yr
-
08 2.3212: Optimize plant power factor $5,440 $23,030 - $5,440
-
kW-mo/yr
-
09 2.2614: Use cooling tower or economizer to replace chiller cooling $5,528 $27,000 $5,053
56,784
kWh
$475
-
kW-mo/yr
-
TOTAL RECOMMENDED $170,476 $259,230 $104,173
1,170,496
kWh
$23,083
-
kW-mo/yr
$43,220
-
MMBtu
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs