Assessment Year | 2023 |
---|---|
Principal Product | Generic Drugs |
NAICS | 325412: Pharmaceutical Preparation Manufacturing |
SIC | 2834: Pharmaceutical Preparations |
Sales Range | $50 M to 100M |
# of Employees | 400 |
Plant Area |
110,000
ft2
|
Annual Production | 100,000
ton
|
Production Hrs. Annual | 5,928
hrs
|
Location (State) | Pennsylvania |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $1,624,123 | 18,232,286 |
kWh
|
$0.089 |
Electricity Demand | $209,600 | 34,421 |
kW-mo/yr
|
$6.09 |
Electricity Fees | $56,701 | - |
|
- |
Natural Gas | $497,848 | 47,505 |
MMBtu
|
$10.48 |
TOTAL YEARLY COSTS | $2,388,272 | |||
RECOMMENDED SAVINGS* | $170,476 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $14,482 | $4,500 |
$11,704
131,505
kWh
|
$2,778
-
kW-mo/yr
|
- | |
02 | 2.6212: Turn off equipment during breaks, reduce operating time | $43,220 | $20,000 | - | - |
$43,220
-
MMBtu
|
|
03 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $30,997 | $20,300 |
$27,227
305,919
kWh
|
$3,770
-
kW-mo/yr
|
- | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $39,746 | $72,400 |
$34,809
391,116
kWh
|
$4,937
-
kW-mo/yr
|
- | |
05 | 2.4221: Install compressor air intakes in coolest locations | $1,099 | $2,000 |
$965
10,849
kWh
|
$134
-
kW-mo/yr
|
- | |
06 | 2.4226: Use / purchase optimum sized compressor | $14,194 | $40,000 |
$12,464
140,039
kWh
|
$1,730
-
kW-mo/yr
|
- | |
07 | 2.7261: Install timers and/or thermostats | $15,770 | $50,000 |
$11,951
134,284
kWh
|
$3,819
-
kW-mo/yr
|
- | |
08 | 2.3212: Optimize plant power factor | $5,440 | $23,030 | - |
$5,440
-
kW-mo/yr
|
- | |
09 | 2.2614: Use cooling tower or economizer to replace chiller cooling | $5,528 | $27,000 |
$5,053
56,784
kWh
|
$475
-
kW-mo/yr
|
- | |
TOTAL RECOMMENDED | $170,476 | $259,230 |
$104,173
1,170,496
kWh
|
$23,083
-
kW-mo/yr
|
$43,220
-
MMBtu
|
||
TOTAL IMPLEMENTED | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs