12
matching recommendations
$
$
ARC | 2+ Digits Required | |
NAICS | Other chemical and fertilizer mineral mining | |
SIC | 2+ Digits Required | |
3+ Characters Required for Products |
ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
---|---|---|---|---|---|---|
OR0621 #03 Y:2013 | 03 | 2013 | Replace hydraulic / pneumatic equipment with electric equipment | $423 | $13,505 | |
OR0621 #02 Y:2013 | 02 | 2013 | Utilize higher efficiency lamps and/or ballasts | $9,765 | $65,592 | |
OR0621 #01 Y:2013 | 01 | 2013 | Improve combustion control capability | $1,962 | $2,256 | |
MA0696 #09 Y:2012 | 09 | 2012 | Insulate bare equipment | $622 | $1,100 | |
MA0696 #08 Y:2012 | 08 | 2012 | Install occupancy sensors | $1,705 | $4,080 | |
MA0696 #07 Y:2012 | 07 | 2012 | Reduce the pressure of compressed air to the minimum required | $1,810 | $200 | |
MA0696 #06 Y:2012 | 06 | 2012 | Use adjustable frequency drive or multiple speed motors on existing system | $2,462 | $6,035 | |
MA0696 #05 Y:2012 | 05 | 2012 | Utilize higher efficiency lamps and/or ballasts | $3,048 | $6,600 | |
MA0696 #04 Y:2012 | 04 | 2012 | Preheat combustion air with waste heat | $3,539 | $17,500 | |
MA0696 #03 Y:2012 | 03 | 2012 | Use optimum temperature | $6,647 | $4,000 | |
MA0696 #02 Y:2012 | 02 | 2012 | Repair and eliminate steam leaks | $15,781 | $2,800 | |
MA0696 #01 Y:2012 | 01 | 2012 | Use optimum size and capacity equipment | $19,393 | $39,000 |