47
matching recommendations| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| CI0056 #07 Y:2025 | 07 | 2025 | Reduce the pressure of compressed air to the minimum required | $964 | $25 |
n/a
|
| CI0056 #06 Y:2025 | 06 | 2025 | Use / purchase optimum sized compressor | $1,422 | $5,500 |
n/a
|
| CI0056 #05 Y:2025 | 05 | 2025 | Use most efficient type of electric motors | $4,704 | $1,520 |
n/a
|
| CI0056 #04 Y:2025 | 04 | 2025 | Optimize plant power factor | $5,225 | $6,500 |
n/a
|
| CI0056 #03 Y:2025 | 03 | 2025 | Use solar heat to make electricty | $9,303 | $28,180 |
n/a
|
| CI0056 #02 Y:2025 | 02 | 2025 | Eliminate leaks in inert gas and compressed air lines/ valves | $9,761 | $1,200 |
n/a
|
| CI0056 #01 Y:2025 | 01 | 2025 | Begin a practice of predictive / preventative maintenance | $400,000 | $100,000 |
n/a
|
| NT0050 #05 Y:2025 | 05 | 2025 | Use properly designed and sized hvac equipment | $2,692 | $7,518 |
n/a
|
| NT0050 #04 Y:2025 | 04 | 2025 | Purchase equipment instead of leasing | $13,978 | $7,020 |
n/a
|
| NT0050 #03 Y:2025 | 03 | 2025 | Utilize higher efficiency lamps and/or ballasts | $26,369 | $56,820 |
n/a
|
| NT0050 #02 Y:2025 | 02 | 2025 | Use or replace with energy efficient substitutes | $118,800 | $170,000 |
n/a
|
| NT0050 #01 Y:2025 | 01 | 2025 | Purchase equipment instead of leasing | $359,441 | $504,900 |
n/a
|
| NT0045 #06 Y:2025 | 06 | 2025 | Begin a practice of predictive / preventative maintenance | $150,000 | $9,690 |
n/a
|
| NT0045 #05 Y:2025 | 05 | 2025 | Train operators for maximum operating efficiency | $150,000 | $100,000 |
n/a
|
| NT0045 #04 Y:2025 | 04 | 2025 | Utilize higher efficiency lamps and/or ballasts | $65,667 | $138,252 |
n/a
|
| NT0045 #03 Y:2025 | 03 | 2025 | Lower temperature during the winter season and vice-versa | $724 | $950 |
n/a
|
| NT0045 #02 Y:2025 | 02 | 2025 | Upgrade controls on compressors | $13,920 | $30,800 |
n/a
|
| NT0045 #01 Y:2025 | 01 | 2025 | Eliminate leaks in inert gas and compressed air lines/ valves | $6,253 | $5,609 |
n/a
|
| WM0072 #06 Y:2015 | 06 | 2015 | Install occupancy sensors | $221 | $476 | |
| WM0072 #05 Y:2015 | 05 | 2015 | Recover waste heat from equipment | $1,054 | $1,390 |