Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

29

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Stone mining and quarrying
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
WM0072 #06 Y:2015 Install occupancy sensors $221 $476
WM0072 #05 Y:2015 Recover waste heat from equipment $1,054 $1,390
WM0072 #04 Y:2015 Install occupancy sensors $1,227 $575
WM0072 #03 Y:2015 Utilize higher efficiency lamps and/or ballasts $2,288 $6,900
WM0072 #02 Y:2015 Utilize higher efficiency lamps and/or ballasts $2,865 $3,846
WM0072 #01 Y:2015 Use adjustable frequency drive or multiple speed motors on existing system $9,713 $20,000
SF0467 #07 Y:2015 Utilize higher efficiency lamps and/or ballasts $32,647 $223,755
SF0467 #06 Y:2015 Install occupancy sensors $522 $2,846
SF0467 #05 Y:2015 Use most efficient type of electric motors $1,388 $5,977
SF0467 #04 Y:2015 Utilize energy-efficient belts and other improved mechanisms $6,324 $4,543
SF0467 #03 Y:2015 Insulate bare equipment $12,922 $8,500
SF0467 #02 Y:2015 Eliminate leaks in inert gas and compressed air lines/ valves $2,437 -
SF0467 #01 Y:2015 Turn off equipment during breaks, reduce operating time $3,119 -
TT0042 #03 Y:2009 Utilize higher efficiency lamps and/or ballasts $4,430 $20,000
TT0042 #02 Y:2009 Recover waste heat from equipment $16,800 $2,900
TT0042 #01 Y:2009 Use waste heat from hot flue gases to preheat $38,600 $28,400
IC0133 #04 Y:2007 Change rate schedules or other changes in utility service $20,000 -
IC0133 #03 Y:2007 Use most efficient type of electric motors $7,116 $22,551
IC0133 #02 Y:2007 Establish equipment maintenance schedule $22,188 -
IC0133 #01 Y:2007 Replace existing equipment with more suitable substitutes $181,608 $3,876