ITAC Assessment: WV0674
ITAC logo
ITAC Assessment: WV0674
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Chemical Repacker Distributor
NAICS 325998: All Other Miscellaneous Chemical Product and Preparation Manufacturing
SIC 2899: Chemicals and Chemical Preparations, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 40
Plant Area 367,927
ft2
Annual Production 180,000
units
Production Hrs. Annual 2,080
hrs
Location (State) West Virginia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $62,692 802,048
kWh
Electricity Demand $23,983 2,273
kW-mo/yr
Electricity Fees $3,980 -
Natural Gas $41,625 3,349
MMBtu
TOTAL YEARLY COSTS $132,280
RECOMMENDED SAVINGS* $21,153 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $10,766 $8,674 $6,630
84,781
kWh
$4,136
-
kW-mo/yr
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $4,374 $8,262 $2,474
31,641
kWh
$1,900
-
kW-mo/yr
-
03 2.7232: Replace existing hvac unit with high efficiency model $3,331 $12,440 - - $3,331
-
MMBtu
04 2.1233: Analyze flue gas for proper air/fuel ratio $696 $1,133 - - $696
-
MMBtu
05 2.7232: Replace existing hvac unit with high efficiency model $658 $3,214 $(-93.0)
(-1,186)
kWh
$(-32.0)
-
kW-mo/yr
$783
-
MMBtu
06 2.4224: Upgrade controls on compressors $562 $2,318 $319
4,078
kWh
$243
-
kW-mo/yr
-
07 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $393 $122 $221
2,824
kWh
$172
-
kW-mo/yr
-
08 2.4231: Reduce the pressure of compressed air to the minimum required $225 $88 $127
1,628
kWh
$98
-
kW-mo/yr
-
09 2.2511: Insulate bare equipment $148 $482 - - $148
-
MMBtu
TOTAL RECOMMENDED $21,153 $36,733 $9,678
123,766
kWh
$6,517
-
kW-mo/yr
$4,958
-
MMBtu
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs