Assessment Year | 2023 |
---|---|
Principal Product | Medical Equipment |
NAICS | 339112: Surgical and Medical Instrument Manufacturing |
SIC | 3841: Surgical and Medical Instruments and Apparatus |
Sales Range | $10 M to 50M |
# of Employees | 200 |
Plant Area |
1,000,968
ft2
|
Annual Production | 60,000
units
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | Maryland |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $552,481 | 14,831,705 |
kWh
|
$0.037 | |
Electricity Demand | $274,979 | 33,305 |
kW-mo/yr
|
$8.26 | |
Natural Gas | $255,122 | 65,095 |
MMBtu
|
$3.92 | |
Waste Disposal Costs | |||||
Water Usage | $230,000 | 4,500 |
Tgal
|
$51.11 | |
TOTAL YEARLY COSTS | $1,312,582 | ||||
RECOMMENDED SAVINGS* | $271,669 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | $29,731 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Usage Savings | Personnel Changes Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 3.4151: Minimize water usage | $150,340 | $110,597 |
$(-657.0)
(-17,622)
kWh
|
- | - |
$160,997
-
Tgal
|
$(-10,000.0) | |
02 | 2.4322: Use or replace with energy efficient substitutes | $37,824 | $112,795 | - | - |
$37,824
-
MMBtu
|
- | - | |
03 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $35,692 | $89,814 |
$23,005
616,748
kWh
|
$12,687
-
kW-mo/yr
|
- | - | - | |
04 | 2.3321: Use steam pressure reduction to generate power | $9,785 | $48,224 |
$6,308
169,112
kWh
|
$3,477
-
kW-mo/yr
|
- | - | - | |
05 | 2.4224: Upgrade controls on compressors | $8,960 | $12,682 |
$7,143
191,488
kWh
|
$1,817
-
kW-mo/yr
|
- | - | - | |
06 | 2.2425: Use flue gases to heat process or service water | $7,758 | $31,568 | - | - |
$7,758
-
MMBtu
|
- | - | |
07 | 2.2614: Use cooling tower or economizer to replace chiller cooling | $5,257 | $16,181 |
$4,035
108,185
kWh
|
$1,222
-
kW-mo/yr
|
- | - | - | |
08 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $3,490 | $301 |
$2,681
71,885
kWh
|
$809
-
kW-mo/yr
|
- | - | - | |
09 | 2.4151: Develop a repair/replace policy | $3,094 | $1,481 |
$2,492
66,817
kWh
|
$756
-
kW-mo/yr
|
- | - | $(-154.0) | |
10 | 2.4221: Install compressor air intakes in coolest locations | $3,040 | $9,723 |
$2,102
56,366
kWh
|
$636
-
kW-mo/yr
|
$302
-
MMBtu
|
- | - | |
11 | 2.4239: Eliminate or reduce compressed air usage | $2,436 | $1,807 |
$1,866
50,015
kWh
|
$570
-
kW-mo/yr
|
- | - | - | |
12 | 2.4157: Establish a predictive maintenance program | $1,904 | $1,500 |
$2,658
71,271
kWh
|
$809
-
kW-mo/yr
|
- | - | $(-1,563.0) | |
13 | 2.4239: Eliminate or reduce compressed air usage | $669 | $1,895 |
$661
17,725
kWh
|
$8
-
kW-mo/yr
|
- | - | - | |
14 | 2.7135: Install occupancy sensors | $644 | $1,312 |
$347
9,297
kWh
|
$297
-
kW-mo/yr
|
- | - | - | |
15 | 2.1233: Analyze flue gas for proper air/fuel ratio | $419 | $909 | - | - |
$419
-
MMBtu
|
- | - | |
16 | 2.2511: Insulate bare equipment | $357 | $407 | - | - |
$357
-
MMBtu
|
- | - | |
TOTAL RECOMMENDED | $271,669 | $441,196 |
$52,641
1,411,287
kWh
|
$23,088
-
kW-mo/yr
|
$46,660
-
MMBtu
|
$160,997
-
Tgal
|
$(-11,717.0) | ||
TOTAL IMPLEMENTED | $29,731 | $53,862 |
$17,848
478,498
kWh
|
$5,066
-
kW-mo/yr
|
$8,534
-
MMBtu
|
- | $(-1,717.0) | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Usage Savings | Personnel Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs