Assessment Year | 2022 |
---|---|
Principal Product | Wastewater Treatment |
NAICS | 221320: Sewage Treatment Facilities |
SIC | 4952: Sewerage Systems |
Sales Range | $50 M to 100M |
# of Employees | 30 |
Plant Area |
290,000
ft2
|
Annual Production | 3,630,000
Tgal
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | Maryland |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $262,718 | 4,299,254 |
kWh
|
$0.061 |
Electricity Demand | $42,388 | 17,231 |
kW-mo/yr
|
$2.46 |
Electricity Fees | $10,297 | - |
|
- |
Fuel Oil #2 | $9,200 | 301 |
MMBtu
|
$30.56 |
TOTAL YEARLY COSTS | $324,603 | |||
RECOMMENDED SAVINGS* | $69,318 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $11,235 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Fuel Oil #2 Savings | Personnel Changes Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.5195: Change product design to reduce energy requirements | $45,174 | $141,500 |
$42,812
700,694
kWh
|
$2,362
-
kW-mo/yr
|
- | - | |
02 | 2.4322: Use or replace with energy efficient substitutes | $12,909 | $43,000 |
$12,235
200,244
kWh
|
$674
-
kW-mo/yr
|
- | - | |
03 | 2.7135: Install occupancy sensors | $8,882 | $8,985 |
$8,417
137,764
kWh
|
$465
-
kW-mo/yr
|
- | - | |
04 | 2.4151: Develop a repair/replace policy | $1,166 | $1,633 |
$1,247
20,413
kWh
|
$69
-
kW-mo/yr
|
- | $(-150.0) | |
05 | 2.4157: Establish a predictive maintenance program | $973 | $1,500 |
$2,217
36,290
kWh
|
$123
-
kW-mo/yr
|
- | $(-1,367.0) | |
06 | 2.1233: Analyze flue gas for proper air/fuel ratio | $214 | $908 | - | - |
$214
-
MMBtu
|
- | |
TOTAL RECOMMENDED | $69,318 | $197,526 |
$66,928
1,095,405
kWh
|
$3,693
-
kW-mo/yr
|
$214
-
MMBtu
|
$(-1,517.0) | ||
TOTAL IMPLEMENTED | $11,235 | $13,026 |
$11,881
194,467
kWh
|
$657
-
kW-mo/yr
|
$214
-
MMBtu
|
$(-1,517.0) | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Fuel Oil #2 Savings | Personnel Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs