ITAC Assessment: WV0126
ITAC logo
ITAC Assessment: WV0126
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product FRP Products
NAICS
n/a
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 170
Plant Area 108,600
ft2
Annual Production 3,000,000
lb
Production Hrs. Annual 6,000
hrs
Location (State) Pennsylvania

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $99,082 2,960,141
kWh
Electricity Demand $76,496 7,270
kW-mo/yr
Electricity Fees $22,488 -
Natural Gas $136,517 32,110
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $86,654 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $14,174

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $4,812 $711 $3,153
76,788
kWh
$1,659
-
kW-mo/yr
- - -
02 2.4133: Use most efficient type of electric motors $1,521 $3,990 $433
10,551
kWh
$1,088
-
kW-mo/yr
- - -
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $650 $280 $650
15,826
kWh
- - - -
04 2.7241: Install outside air damper / economizer on hvac unit $1,272 $1,717 $1,272
31,067
kWh
- - - -
05 2.2511: Insulate bare equipment $740 $858 - - $740
-
MMBtu
- -
06 2.2492: Use "heat wheel" or other heat exchanger to cross-exchange building exhaust air with make-up air $11,475 $1,360 - - $11,475
-
MMBtu
- -
07 2.7447: Install vinyl strip / high speed / air curtain doors $1,005 $196 - - $1,005
-
MMBtu
- -
08 2.1213: Direct warmest air to combustion intake $4,906 $3,750 - - $4,906
-
MMBtu
- -
09 3.5217: Reuse / recycle/ sell paper products $188 - - - - - $188
10 3.5217: Reuse / recycle/ sell paper products $85 - - - - - $85
11 4.431: Train operators for maximum operating efficiency $60,000 - - - - $60,000 -
TOTAL RECOMMENDED $86,654 $12,862 $5,508
134,232
kWh
$2,747
-
kW-mo/yr
$18,126
-
MMBtu
$60,000 $273
TOTAL IMPLEMENTED $14,174 $11,306 $5,508
134,232
kWh
$2,747
-
kW-mo/yr
$5,646
-
MMBtu
- $273
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs