Assessment Year | 2003 |
---|---|
Principal Product | ice cream |
NAICS | 311514: Dry, Condensed, and Evaporated Dairy Product Manufacturing |
SIC | 2024: Ice Cream and Frozen Desserts |
Sales Range | $10 M to 50M |
# of Employees | 170 |
Plant Area |
48,000
ft2
|
Annual Production | 2,125
Tgal
|
Production Hrs. Annual | 2,080
hrs
|
Location (State) | Utah |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $92,278 | 3,326,880 |
kWh
|
$0.028 |
Electricity Demand | $83,219 | 10,274 |
kW-mo/yr
|
$8.10 |
Electricity Fees | $15,852 | - |
|
- |
Natural Gas | $33,380 | 7,940 |
MMBtu
|
$4.20 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $47,561 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $7,110 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $792 | $100 |
$295
9,780
kWh
|
$497
-
kW-mo/yr
|
- | - | |
02 | 2.4231: Reduce the pressure of compressed air to the minimum required | $829 | $20 |
$309
10,260
kWh
|
$520
-
kW-mo/yr
|
- | - | |
03 | 2.4221: Install compressor air intakes in coolest locations | $279 | $129 |
$104
3,459
kWh
|
$175
-
kW-mo/yr
|
- | - | |
04 | 2.2414: Use waste heat from hot flue gases to preheat | $2,240 | $6,450 | - | - |
$2,240
-
MMBtu
|
- | |
05 | 2.2121: Increase amount of condensate returned | $4,493 | $25,000 | - | - |
$4,181
-
MMBtu
|
$312
-
Tgal
|
|
06 | 2.1233: Analyze flue gas for proper air/fuel ratio | $4,110 | $2,000 | - | - |
$4,110
-
MMBtu
|
- | |
07 | 2.1222: Install turbulators | $1,680 | $1,747 | - | - |
$1,680
-
MMBtu
|
- | |
08 | 2.2136: Install / repair insulation on steam lines | $1,320 | $809 | - | - |
$1,320
-
MMBtu
|
- | |
09 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $5,920 | - | - |
$5,920
-
kW-mo/yr
|
- | - | |
10 | 2.7124: Make a practice of turning off lights when not needed | $398 | $20 |
$151
4,990
kWh
|
$247
-
kW-mo/yr
|
- | - | |
11 | 3.3132: Use reverse osmosis to concentrate material | $25,500 | $192,450 | - | - | - |
$25,500
-
Tgal
|
|
TOTAL RECOMMENDED | $47,561 | $228,725 |
$859
28,489
kWh
|
$7,359
-
kW-mo/yr
|
$13,531
-
MMBtu
|
$25,812
-
Tgal
|
||
TOTAL IMPLEMENTED | $7,110 | $120 |
$446
14,770
kWh
|
$6,664
-
kW-mo/yr
|
- | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs