ITAC Assessment: WV0601
ITAC logo
ITAC Assessment: WV0601
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2021
Principal Product Distilled Spirits
NAICS 312140: Distilleries
SIC 2085: Distilled and Blended Liquors
Sales Range $10
M
to 50
M
# of Employees 28
Plant Area 6,766
ft2
Annual Production 159
Tgal
Production Hrs. Annual 8,400
hrs
Location (State) West Virginia
View Case Study

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $29,162 746,827
kWh
Electricity Demand $36,410 2,107
kW-mo/yr
Electricity Fees $2,014 -
Natural Gas $71,556 10,194
MMBtu
LPG $1,330 66
MMBtu
Waste Disposal Costs
Other Liquid (non-haz) $91,800 540,000
gal
Solid Waste (non-haz) $24,550 54,000
lb
Gaseous Waste $15,085 2,011,350
lb
TOTAL YEARLY COSTS $271,907
RECOMMENDED SAVINGS* $59,174 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $59,174

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Liquid (non-haz) Savings Solid Waste (non-haz) Savings Gaseous Waste Savings Personnel Changes Savings
01 3.3131: Use evaporation to concentrate material $24,050 $90,000 - - - $91,800
-
gal
$(-24,550.0)
-
lb
- $(-43,200.0)
02 3.5311: Recover and reuse waste material $15,085 $15,000 - - - - - $15,085
-
lb
-
03 2.1233: Analyze flue gas for proper air/fuel ratio $5,944 $3,000 - - $5,944
-
MMBtu
- - - -
04 2.4145: Install isolation transformer on adjustable frequency drive $4,392 $6,660 $2,733
70,080
kWh
$1,659
-
kW-mo/yr
- - - - -
05 2.2437: Recover waste heat from equipment $2,885 $13,900 - - $2,885
-
MMBtu
- - - -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $2,355 $1,691 $1,128
28,926
kWh
$1,227
-
kW-mo/yr
- - - - -
07 2.2442: Preheat combustion air with waste heat $2,303 $10,560 $(-175.0)
(-4,487)
kWh
- $2,478
-
MMBtu
- - - -
08 2.2511: Insulate bare equipment $1,509 $2,170 - - $1,509
-
MMBtu
- - - -
09 2.4224: Upgrade controls on compressors $514 $1,425 $319
8,181
kWh
$195
-
kW-mo/yr
- - - - -
10 2.4231: Reduce the pressure of compressed air to the minimum required $137 $530 $85
2,178
kWh
$52
-
kW-mo/yr
- - - - -
TOTAL RECOMMENDED $59,174 $144,936 $4,090
104,878
kWh
$3,133
-
kW-mo/yr
$12,816
-
MMBtu
$91,800
-
gal
$(-24,550.0)
-
lb
$15,085
-
lb
$(-43,200.0)
TOTAL IMPLEMENTED $59,174 $144,936 $4,090
104,878
kWh
$3,133
-
kW-mo/yr
$12,816
-
MMBtu
$91,800
-
gal
$(-24,550.0)
-
lb
$15,085
-
lb
$(-43,200.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Liquid (non-haz) Savings Solid Waste (non-haz) Savings Gaseous Waste Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs