ITAC Assessment: WV0600
ITAC logo
ITAC Assessment: WV0600
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2021
Principal Product Domestic Airport
NAICS 488119: Other Airport Operations
SIC 4581: Airports, Flying Fields, and Airport Terminal Services
Sales Range $1
M
to 5
M
# of Employees 11
Plant Area 64,121
ft2
Annual Production 5,000
units
Production Hrs. Annual 8,760
hrs
Location (State) West Virginia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $34,170 747,835
kWh
Electricity Demand $30,090 1,788
kW-mo/yr
Electricity Fees $1,560 -
Natural Gas $34,489 4,818
MMBtu
TOTAL YEARLY COSTS $100,309
RECOMMENDED SAVINGS* $27,592 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $9,898

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings
01 2.7135: Install occupancy sensors $9,760 $21,875 $5,435
118,932
kWh
$4,325
-
kW-mo/yr
- -
02 2.7232: Replace existing hvac unit with high efficiency model $8,711 $49,640 $5,790
126,689
kWh
$2,921
-
kW-mo/yr
- -
03 2.7241: Install outside air damper / economizer on hvac unit $4,882 $9,100 $3,990
87,314
kWh
$892
-
kW-mo/yr
- -
04 2.7229: Air condition only space necessary $3,261 $11,061 $486
10,640
kWh
$421
-
kW-mo/yr
$2,354
-
MMBtu
-
05 2.7261: Install timers and/or thermostats $840 $1,330 - - $840
-
MMBtu
-
06 2.1233: Analyze flue gas for proper air/fuel ratio $138 $750 - - $183
-
MMBtu
$(-45.0)
TOTAL RECOMMENDED $27,592 $93,756 $15,701
343,575
kWh
$8,559
-
kW-mo/yr
$3,377
-
MMBtu
$(-45.0)
TOTAL IMPLEMENTED $9,898 $22,625 $5,435
118,932
kWh
$4,325
-
kW-mo/yr
$183
-
MMBtu
$(-45.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs