ITAC Assessment: WV0588
ITAC logo
ITAC Assessment: WV0588
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2019
Principal Product Water treatment
NAICS 221310: Water Supply and Irrigation Systems
SIC 4941: Water Supply
Sales Range $10
M
to 50
M
# of Employees 16
Plant Area 65,000
ft2
Annual Production 4,000,000
Tgal
Production Hrs. Annual 8,760
hrs
Location (State) West Virginia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $301,797 7,962,632
kWh
Electricity Demand $248,895 13,971
kW-mo/yr
Electricity Fees $17,473 -
Natural Gas $17,519 2,215
MMBtu
TOTAL YEARLY COSTS $585,684
RECOMMENDED SAVINGS* $28,046 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $13,594

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $11,179 $22,995 $6,174
162,898
kWh
$5,005
-
kW-mo/yr
-
02 2.7241: Install outside air damper / economizer on hvac unit $9,425 $9,350 $5,738
151,400
kWh
$3,687
-
kW-mo/yr
-
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $5,027 $10,000 $5,027
132,631
kWh
- -
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,724 - $1,047
27,632
kWh
$677
-
kW-mo/yr
-
05 2.4151: Develop a repair/replace policy $691 $651 $1,131
29,852
kWh
- $(-440.0)
TOTAL RECOMMENDED $28,046 $42,996 $19,117
504,413
kWh
$9,369
-
kW-mo/yr
$(-440.0)
TOTAL IMPLEMENTED $13,594 $23,646 $8,352
220,382
kWh
$5,682
-
kW-mo/yr
$(-440.0)
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs