ITAC Assessment: WV0586
ITAC logo
ITAC Assessment: WV0586
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2019
Principal Product Waste Water
NAICS 221310: Water Supply and Irrigation Systems
SIC 4941: Water Supply
Sales Range $10
M
to 50
M
# of Employees 71
Plant Area 240,000
ft2
Annual Production 1,992,000
Tgal
Production Hrs. Annual 8,760
hrs
Location (State) Virginia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $423,704 6,219,603
kWh
Electricity Demand $135,100 14,831
kW-mo/yr
Electricity Fees $9,116 -
Waste Disposal Costs
Solid Waste (haz) $136,416 11,083,225
lb
TOTAL YEARLY COSTS $704,336
RECOMMENDED SAVINGS* $156,522 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $40,485

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Solid Waste (haz) Savings Personnel Changes Savings
01 3.6193: Install equipment (eg compactor) to reduce disposal costs $110,861 $242,750 $(-25,555.0)
(-375,262)
kWh
- $136,416
-
lb
-
02 4.661: Level zero – install control systems for existing equipment $31,539 $1,630 $31,539
463,122
kWh
- - -
03 2.4151: Develop a repair/replace policy $3,336 $894 $3,193
46,892
kWh
$583
-
kW-mo/yr
- $(-440.0)
04 4.661: Level zero – install control systems for existing equipment $3,276 $11,875 $3,276
48,103
kWh
- - -
05 2.4157: Establish a predictive maintenance program $2,701 $1,000 $4,542
66,691
kWh
$829
-
kW-mo/yr
- $(-2,670.0)
06 2.7142: Utilize higher efficiency lamps and/or ballasts $2,909 $2,793 $2,198
32,270
kWh
$711
-
kW-mo/yr
- -
07 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,900 - $1,608
23,618
kWh
$292
-
kW-mo/yr
- -
TOTAL RECOMMENDED $156,522 $260,942 $20,801
305,434
kWh
$2,415
-
kW-mo/yr
$136,416
-
lb
$(-3,110.0)
TOTAL IMPLEMENTED $40,485 $6,317 $41,472
608,975
kWh
$2,123
-
kW-mo/yr
- $(-3,110.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Solid Waste (haz) Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs