ITAC Assessment: WV0572
ITAC logo
ITAC Assessment: WV0572
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2019
Principal Product Waste Water Treatment
NAICS 221320: Sewage Treatment Facilities
SIC 4952: Sewerage Systems
Sales Range $10
M
to 50
M
# of Employees 9
Plant Area 460,000
ft2
Annual Production 2,060,000
Tgal
Production Hrs. Annual 8,760
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $343,479 3,585,000
kWh
Electricity Demand $58,968 7,560
kW-mo/yr
Natural Gas $7,446 967
MMBtu
TOTAL YEARLY COSTS $409,893
RECOMMENDED SAVINGS* $39,515 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $21,006

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Personnel Changes Savings
01 2.4157: Establish a predictive maintenance program $12,987 $1,000 $13,836
144,426
kWh
- - $(-849.0)
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $6,442 $38,062 $6,442
67,247
kWh
- - -
03 2.4313: Provide proper maintenance of motor driven equipment $6,835 $6,336 $6,149
64,188
kWh
$686
-
kW-mo/yr
- -
04 2.7135: Install occupancy sensors $5,205 $2,889 $4,573
47,733
kWh
$632
-
kW-mo/yr
- -
05 2.4151: Develop a repair/replace policy $2,814 $587 $2,724
28,435
kWh
$304
-
kW-mo/yr
- $(-214.0)
06 2.3212: Optimize plant power factor $5,232 $5,400 - - $5,232 -
TOTAL RECOMMENDED $39,515 $54,274 $33,724
352,029
kWh
$1,622
-
kW-mo/yr
$5,232 $(-1,063.0)
TOTAL IMPLEMENTED $21,006 $4,476 $21,133
220,594
kWh
$936
-
kW-mo/yr
- $(-1,063.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs