ITAC Assessment: WV0251
ITAC logo
ITAC Assessment: WV0251
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2002
Principal Product Machinery for plastic processing
NAICS
n/a
SIC 3599: Industrial and Commercial Machinery and Equipment, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 211
Plant Area 106,000
ft2
Annual Production 17,000,000
pieces
Production Hrs. Annual 7,600
hrs
Location (State) Virginia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $151,828 2,508,594
kWh
Electricity Demand $43,072 7,209
kW-mo/yr
Electricity Fees $2,056 -
Natural Gas $1,424 121
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $93,405 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $42,150

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Other Liquid (non-haz) Savings Personnel Changes Savings Administrative Changes Savings
01 2.4221: Install compressor air intakes in coolest locations $1,178 $630 $911
14,850
kWh
$267
-
kW-mo/yr
- - -
02 2.4231: Reduce the pressure of compressed air to the minimum required $1,295 $180 $1,001
16,328
kWh
$294
-
kW-mo/yr
- - -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $4,218 - $2,696
43,584
kWh
$1,522
-
kW-mo/yr
- - -
04 2.2628: Utilize a less expensive cooling method $2,860 $948 $2,210
36,039
kWh
$650
-
kW-mo/yr
- - -
05 2.3191: Use demand controller or load shedder $13,680 $3,000 - $13,680
-
kW-mo/yr
- - -
06 2.6221: Use most efficient equipment at it's maximum capacity and less efficient equipment only when necessary $6,786 $600 $5,803
94,639
kWh
$1,703
-
kW-mo/yr
- $(-720.0) -
07 2.7111: Reduce illumination to minimum necessary levels $4,709 $180 $2,965
48,345
kWh
$1,744
-
kW-mo/yr
- - -
08 2.7142: Utilize higher efficiency lamps and/or ballasts $4,964 $8,610 $2,678
43,657
kWh
$2,286
-
kW-mo/yr
- - -
09 3.2123: Convert to high volume low pressure (hvlp) paint guns $3,575 $830 - - $3,575
-
gal
- -
10 4.451: Add additional production shift $34,000 $2,000 - - - - $34,000
11 4.731: Advertise product or service $16,140 $1,000 - - - - $16,140
TOTAL RECOMMENDED $93,405 $17,978 $18,264
297,442
kWh
$22,146
-
kW-mo/yr
$3,575
-
gal
$(-720.0) $50,140
TOTAL IMPLEMENTED $42,150 $12,148 $18,264
297,442
kWh
$8,466
-
kW-mo/yr
- $(-720.0) $16,140
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Other Liquid (non-haz) Savings Personnel Changes Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs