Assessment Year | 2018 |
---|---|
Principal Product | Water |
NAICS | 221310: Water Supply and Irrigation Systems |
SIC | 4941: Water Supply |
Sales Range | $10 M to 50M |
# of Employees | 32 |
Plant Area |
400,000
ft2
|
Annual Production | 1,006,000
Tgal
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | West Virginia |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $185,754 | 3,133,980 |
kWh
|
$0.059 | |
Electricity Demand | $42,184 | 5,670 |
kW-mo/yr
|
$7.44 | |
Electricity Fees | $504 | - |
|
- | |
Waste Disposal Costs | |||||
Solid Waste (non-haz) | $75,600 | 5,040,000 |
lb
|
$0.015 | |
TOTAL YEARLY COSTS | $304,042 | ||||
RECOMMENDED SAVINGS* | $99,182 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | $14,377 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $11,605 | $52,080 |
$11,605
195,703
kWh
|
- | - | - | - | |
02 | 2.5195: Change product design to reduce energy requirements | $9,840 | $2,800 |
$8,397
141,598
kWh
|
$1,443
-
kW-mo/yr
|
- | - | - | |
03 | 2.4313: Provide proper maintenance of motor driven equipment | $3,286 | $3,400 |
$3,241
54,661
kWh
|
$45
-
kW-mo/yr
|
- | - | - | |
04 | 2.4151: Develop a repair/replace policy | $1,251 | $562 |
$1,411
23,788
kWh
|
- | - | - | $(-160.0) | |
05 | 3.6193: Install equipment (eg compactor) to reduce disposal costs | $73,200 | $3,000 | - | - |
$75,600
-
lb
|
$(-2,400.0) | - | |
TOTAL RECOMMENDED | $99,182 | $61,842 |
$24,654
415,750
kWh
|
$1,488
-
kW-mo/yr
|
$75,600
-
lb
|
$(-2,400.0) | $(-160.0) | ||
TOTAL IMPLEMENTED | $14,377 | $6,762 |
$13,049
220,047
kWh
|
$1,488
-
kW-mo/yr
|
- | - | $(-160.0) |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs