ITAC Assessment: WV0568
ITAC logo
ITAC Assessment: WV0568
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2018
Principal Product Water
NAICS 221310: Water Supply and Irrigation Systems
SIC 4941: Water Supply
Sales Range $10
M
to 50
M
# of Employees 32
Plant Area 400,000
ft2
Annual Production 1,006,000
Tgal
Production Hrs. Annual 8,760
hrs
Location (State) West Virginia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $185,754 3,133,980
kWh
Electricity Demand $42,184 5,670
kW-mo/yr
Electricity Fees $504 -
Waste Disposal Costs
Solid Waste (non-haz) $75,600 5,040,000
lb
TOTAL YEARLY COSTS $304,042
RECOMMENDED SAVINGS* $99,182 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $14,377

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Personnel Changes Savings Administrative Changes Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $11,605 $52,080 $11,605
195,703
kWh
- - - -
02 2.5195: Change product design to reduce energy requirements $9,840 $2,800 $8,397
141,598
kWh
$1,443
-
kW-mo/yr
- - -
03 2.4313: Provide proper maintenance of motor driven equipment $3,286 $3,400 $3,241
54,661
kWh
$45
-
kW-mo/yr
- - -
04 2.4151: Develop a repair/replace policy $1,251 $562 $1,411
23,788
kWh
- - - $(-160.0)
05 3.6193: Install equipment (eg compactor) to reduce disposal costs $73,200 $3,000 - - $75,600
-
lb
$(-2,400.0) -
TOTAL RECOMMENDED $99,182 $61,842 $24,654
415,750
kWh
$1,488
-
kW-mo/yr
$75,600
-
lb
$(-2,400.0) $(-160.0)
TOTAL IMPLEMENTED $14,377 $6,762 $13,049
220,047
kWh
$1,488
-
kW-mo/yr
- - $(-160.0)
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs