ITAC Assessment: WV0567
ITAC logo
ITAC Assessment: WV0567
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2018
Principal Product Electroplating
NAICS 332813: Electroplating, Plating, Polishing, Anodizing, and Coloring
SIC 3471: Electroplating, Plating, Polishing, Anodizing, and Coloring
Sales Range $1
M
to 5
M
# of Employees 22
Plant Area 28,000
ft2
Annual Production 5,200
pieces
Production Hrs. Annual 2,080
hrs
Location (State) West Virginia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $41,853 589,925
kWh
Electricity Demand $18,292 2,488
kW-mo/yr
Electricity Fees $5,410 -
Natural Gas $37,219 5,386
MMBtu
Waste Disposal Costs
Water Usage $5,343 451
Tgal
TOTAL YEARLY COSTS $108,117
RECOMMENDED SAVINGS* $43,056 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $12,347

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Usage Savings Personnel Changes Savings
01 2.1221: Replace obsolete burners with more efficient ones $11,443 $23,150 - - $11,443
-
MMBtu
- -
02 2.3191: Use demand controller or load shedder $5,472 $5,600 - $5,472
-
kW-mo/yr
- - -
03 3.1191: Change procedures / equipment / operating conditions $9,322 $15,000 $21
293
kWh
$18
-
kW-mo/yr
$283
-
MMBtu
- $9,000
04 2.7135: Install occupancy sensors $5,896 $6,014 $3,384
47,733
kWh
$2,512
-
kW-mo/yr
- - -
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $4,472 $2,150 $2,566
36,192
kWh
$1,906
-
kW-mo/yr
- - -
06 3.5131: Recycle white water $4,061 $450 - - - $4,061
-
Tgal
-
07 2.2511: Insulate bare equipment $1,487 $1,690 - - $1,487
-
MMBtu
- -
08 2.1233: Analyze flue gas for proper air/fuel ratio $495 $500 - - $518
-
MMBtu
- $(-23.0)
09 2.4151: Develop a repair/replace policy $408 $563 $267
3,768
kWh
$201
-
kW-mo/yr
- - $(-60.0)
TOTAL RECOMMENDED $43,056 $55,117 $6,238
87,986
kWh
$10,109
-
kW-mo/yr
$13,731
-
MMBtu
$4,061
-
Tgal
$8,917
TOTAL IMPLEMENTED $12,347 $9,217 $3,651
51,501
kWh
$2,713
-
kW-mo/yr
$2,005
-
MMBtu
$4,061
-
Tgal
$(-83.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Usage Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs