Assessment Year | 2018 |
---|---|
Principal Product | Electroplating |
NAICS | 332813: Electroplating, Plating, Polishing, Anodizing, and Coloring |
SIC | 3471: Electroplating, Plating, Polishing, Anodizing, and Coloring |
Sales Range | $1 M to 5M |
# of Employees | 22 |
Plant Area |
28,000
ft2
|
Annual Production | 5,200
pieces
|
Production Hrs. Annual | 2,080
hrs
|
Location (State) | West Virginia |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $41,853 | 589,925 |
kWh
|
$0.071 | |
Electricity Demand | $18,292 | 2,488 |
kW-mo/yr
|
$7.35 | |
Electricity Fees | $5,410 | - |
|
- | |
Natural Gas | $37,219 | 5,386 |
MMBtu
|
$6.91 | |
Waste Disposal Costs | |||||
Water Usage | $5,343 | 451 |
Tgal
|
$11.85 | |
TOTAL YEARLY COSTS | $108,117 | ||||
RECOMMENDED SAVINGS* | $43,056 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | $12,347 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Usage Savings | Personnel Changes Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.1221: Replace obsolete burners with more efficient ones | $11,443 | $23,150 | - | - |
$11,443
-
MMBtu
|
- | - | |
02 | 2.3191: Use demand controller or load shedder | $5,472 | $5,600 | - |
$5,472
-
kW-mo/yr
|
- | - | - | |
03 | 3.1191: Change procedures / equipment / operating conditions | $9,322 | $15,000 |
$21
293
kWh
|
$18
-
kW-mo/yr
|
$283
-
MMBtu
|
- | $9,000 | |
04 | 2.7135: Install occupancy sensors | $5,896 | $6,014 |
$3,384
47,733
kWh
|
$2,512
-
kW-mo/yr
|
- | - | - | |
05 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $4,472 | $2,150 |
$2,566
36,192
kWh
|
$1,906
-
kW-mo/yr
|
- | - | - | |
06 | 3.5131: Recycle white water | $4,061 | $450 | - | - | - |
$4,061
-
Tgal
|
- | |
07 | 2.2511: Insulate bare equipment | $1,487 | $1,690 | - | - |
$1,487
-
MMBtu
|
- | - | |
08 | 2.1233: Analyze flue gas for proper air/fuel ratio | $495 | $500 | - | - |
$518
-
MMBtu
|
- | $(-23.0) | |
09 | 2.4151: Develop a repair/replace policy | $408 | $563 |
$267
3,768
kWh
|
$201
-
kW-mo/yr
|
- | - | $(-60.0) | |
TOTAL RECOMMENDED | $43,056 | $55,117 |
$6,238
87,986
kWh
|
$10,109
-
kW-mo/yr
|
$13,731
-
MMBtu
|
$4,061
-
Tgal
|
$8,917 | ||
TOTAL IMPLEMENTED | $12,347 | $9,217 |
$3,651
51,501
kWh
|
$2,713
-
kW-mo/yr
|
$2,005
-
MMBtu
|
$4,061
-
Tgal
|
$(-83.0) | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Usage Savings | Personnel Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs