ITAC Assessment: WV0563
ITAC logo
ITAC Assessment: WV0563
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2018
Principal Product Automobile plastic parts
NAICS 326199: All Other Plastics Product Manufacturing
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 1,000
Plant Area 590,000
ft2
Annual Production 90,000,000
lb
Production Hrs. Annual 8,760
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $3,749,076 43,162,347
kWh
Electricity Demand $659,585 82,448
kW-mo/yr
Natural Gas $846,973 182,370
MMBtu
Waste Disposal Costs
Water Usage $2,602 788
Tgal
TOTAL YEARLY COSTS $5,258,236
RECOMMENDED SAVINGS* $238,323 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $21,468

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Water Consumption Savings
01 2.4224: Upgrade controls on compressors $85,272 $36,000 $85,272
981,280
kWh
- - - -
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $83,489 $54,000 $83,489
960,744
kWh
- - - -
03 2.2437: Recover waste heat from equipment $35,888 $173,323 $24,072
277,004
kWh
$11,816
-
kW-mo/yr
- - -
04 2.4151: Develop a repair/replace policy $20,002 $754 $18,114
208,444
kWh
$2,288
-
kW-mo/yr
- $(-400.0) -
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $12,206 $59,750 $12,206
140,458
kWh
- - - -
06 3.4151: Minimize water usage $1,202 $1,400 - - - $(-1,400.0) $2,602
-
Tgal
07 2.2511: Insulate bare equipment $264 $235 - - $264
-
MMBtu
- -
TOTAL RECOMMENDED $238,323 $325,462 $223,153
2,567,930
kWh
$14,104
-
kW-mo/yr
$264
-
MMBtu
$(-1,800.0) $2,602
-
Tgal
TOTAL IMPLEMENTED $21,468 $2,389 $18,114
208,444
kWh
$2,288
-
kW-mo/yr
$264
-
MMBtu
$(-1,800.0) $2,602
-
Tgal
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Water Consumption Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs