Assessment Year | 2018 |
---|---|
Principal Product | Rail joints |
NAICS | 336510: Railroad Rolling Stock Manufacturing |
SIC | 3743: Railroad Equipment |
Sales Range | $10 M to 50M |
# of Employees | 37 |
Plant Area |
219,000
ft2
|
Annual Production | 30,771
ton
|
Production Hrs. Annual | 4,160
hrs
|
Location (State) | West Virginia |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $192,190 | 2,938,800 |
kWh
|
$0.065 | |
Electricity Demand | $62,375 | 9,006 |
kW-mo/yr
|
$6.93 | |
Electricity Fees | $14,805 | - |
|
- | |
Natural Gas | $56,779 | 8,692 |
MMBtu
|
$6.53 | |
Waste Disposal Costs | |||||
Water Usage | $502 | 46 |
Tgal
|
$11.00 | |
Water Disposal | $1,232 | 46 |
Tgal
|
$27.00 | |
TOTAL YEARLY COSTS | $327,883 | ||||
RECOMMENDED SAVINGS* | $73,594 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | $20,762 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Water Usage Savings | Water Disposal Savings | Personnel Changes Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $43,778 | $37,964 |
$33,529
512,676
kWh
|
$10,249
-
kW-mo/yr
|
- | - | - | |
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $11,821 | $180 |
$9,056
138,472
kWh
|
$2,765
-
kW-mo/yr
|
- | - | - | |
03 | 2.4224: Upgrade controls on compressors | $8,930 | $8,000 |
$8,930
136,556
kWh
|
- | - | - | - | |
04 | 2.4231: Reduce the pressure of compressed air to the minimum required | $4,154 | $80 |
$3,184
48,678
kWh
|
$970
-
kW-mo/yr
|
- | - | - | |
05 | 2.1233: Analyze flue gas for proper air/fuel ratio | $2,101 | $10,000 |
$1,609
24,598
kWh
|
$492
-
kW-mo/yr
|
- | - | - | |
06 | 3.4151: Minimize water usage | $1,679 | $1,400 | - | - |
$502
-
Tgal
|
$1,232
-
Tgal
|
$(-55.0) | |
07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,007 | $1,200 |
$1,007
15,393
kWh
|
- | - | - | - | |
08 | 2.2531: Re-size charging openings or add movable cover or door | $124 | $67 |
$96
1,465
kWh
|
$28
-
kW-mo/yr
|
- | - | - | |
TOTAL RECOMMENDED | $73,594 | $58,891 |
$57,411
877,838
kWh
|
$14,504
-
kW-mo/yr
|
$502
-
Tgal
|
$1,232
-
Tgal
|
$(-55.0) | ||
TOTAL IMPLEMENTED | $20,762 | $12,860 |
$14,856
227,141
kWh
|
$4,227
-
kW-mo/yr
|
$502
-
Tgal
|
$1,232
-
Tgal
|
$(-55.0) | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Water Usage Savings | Water Disposal Savings | Personnel Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs