ITAC Assessment: WV0560
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2018
Principal Product Rail joints
NAICS 336510: Railroad Rolling Stock Manufacturing
SIC 3743: Railroad Equipment
Sales Range $10
M
to 50
M
# of Employees 37
Plant Area 219,000
ft2
Annual Production 30,771
ton
Production Hrs. Annual 4,160
hrs
Location (State) West Virginia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $192,190 2,938,800
kWh
Electricity Demand $62,375 9,006
kW-mo/yr
Electricity Fees $14,805 -
Natural Gas $56,779 8,692
MMBtu
Waste Disposal Costs
Water Usage $502 46
Tgal
Water Disposal $1,232 46
Tgal
TOTAL YEARLY COSTS $327,883
RECOMMENDED SAVINGS* $73,594 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $20,762

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Water Usage Savings Water Disposal Savings Personnel Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $43,778 $37,964 $33,529
512,676
kWh
$10,249
-
kW-mo/yr
- - -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $11,821 $180 $9,056
138,472
kWh
$2,765
-
kW-mo/yr
- - -
03 2.4224: Upgrade controls on compressors $8,930 $8,000 $8,930
136,556
kWh
- - - -
04 2.4231: Reduce the pressure of compressed air to the minimum required $4,154 $80 $3,184
48,678
kWh
$970
-
kW-mo/yr
- - -
05 2.1233: Analyze flue gas for proper air/fuel ratio $2,101 $10,000 $1,609
24,598
kWh
$492
-
kW-mo/yr
- - -
06 3.4151: Minimize water usage $1,679 $1,400 - - $502
-
Tgal
$1,232
-
Tgal
$(-55.0)
07 2.7142: Utilize higher efficiency lamps and/or ballasts $1,007 $1,200 $1,007
15,393
kWh
- - - -
08 2.2531: Re-size charging openings or add movable cover or door $124 $67 $96
1,465
kWh
$28
-
kW-mo/yr
- - -
TOTAL RECOMMENDED $73,594 $58,891 $57,411
877,838
kWh
$14,504
-
kW-mo/yr
$502
-
Tgal
$1,232
-
Tgal
$(-55.0)
TOTAL IMPLEMENTED $20,762 $12,860 $14,856
227,141
kWh
$4,227
-
kW-mo/yr
$502
-
Tgal
$1,232
-
Tgal
$(-55.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Water Usage Savings Water Disposal Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs