ITAC Assessment: WV0541
ITAC logo
ITAC Assessment: WV0541
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2017
Principal Product Aluminum Galvanized Steel
NAICS 332812: Metal Coating, Engraving (except Jewelry and Silverware), and Allied Services to Manufacturers
SIC 3479: Coating, Engraving, and Allied Services, Not Elsewhere Classified
Sales Range $100
M
to 500
M
# of Employees 150
Plant Area 350,000
ft2
Annual Production 700,000
ton
Production Hrs. Annual 8,760
hrs
Location (State) West Virginia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $2,182,083 55,344,357
kWh
Electricity Demand $1,425,639 126,840
kW-mo/yr
Electricity Fees $123,669 -
Natural Gas $1,571,433 715,445
MMBtu
Waste Disposal Costs
Water Usage $45,948 8,621
Tgal
Water Disposal $54,080 5,747
Tgal
Other Liquid (non-haz) $4,000 8,000
gal
TOTAL YEARLY COSTS $5,406,853
RECOMMENDED SAVINGS* $247,387 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $58,712

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Usage Savings Other Liquid (non-haz) Savings Personnel Changes Savings Ancillary Material Cost Savings Primary Product Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $62,969 $252,894 $42,951
1,090,150
kWh
$20,018
-
kW-mo/yr
- - - - - -
02 4.126: Install sensors to detect defects $60,138 $100,000 $7,931
201,291
kWh
- $2,207
-
MMBtu
- - - - $50,000
03 2.4231: Reduce the pressure of compressed air to the minimum required $40,630 $534 $29,210
741,372
kWh
$11,420
-
kW-mo/yr
- - - - - -
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $35,042 $29,880 $25,196
639,480
kWh
$9,846
-
kW-mo/yr
- - - - - -
05 2.2437: Recover waste heat from equipment $29,320 $72,000 $5,975
151,639
kWh
$23,345
-
kW-mo/yr
- - - - - -
06 2.4151: Develop a repair/replace policy $13,353 $1,514 $9,811
249,001
kWh
$3,833
-
kW-mo/yr
- - - $(-291.0) - -
07 2.2511: Insulate bare equipment $3,860 $2,024 - - $3,860
-
MMBtu
- - - - -
08 3.3131: Use evaporation to concentrate material $1,206 $5,500 - - - $38
-
Tgal
$(-432.0)
-
gal
$(-400.0) $2,000 -
09 2.7135: Install occupancy sensors $869 $1,671 $622
15,776
kWh
$247
-
kW-mo/yr
- - - - - -
TOTAL RECOMMENDED $247,387 $466,017 $121,696
3,088,709
kWh
$68,709
-
kW-mo/yr
$6,067
-
MMBtu
$38
-
Tgal
$(-432.0)
-
gal
$(-691.0) $2,000 $50,000
TOTAL IMPLEMENTED $58,712 $5,743 $39,643
1,006,149
kWh
$15,500
-
kW-mo/yr
$3,860
-
MMBtu
- - $(-291.0) - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Usage Savings Other Liquid (non-haz) Savings Personnel Changes Savings Ancillary Material Cost Savings Primary Product Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs