ITAC Assessment: WV0536
ITAC logo
ITAC Assessment: WV0536
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2016
Principal Product Sewage treatment
NAICS 221320: Sewage Treatment Facilities
SIC 4952: Sewerage Systems
Sales Range $1
M
to 5
M
# of Employees 15
Plant Area 320,000
ft2
Annual Production 889
Tgal
Production Hrs. Annual 8,760
hrs
Location (State) Virginia
View Case Study

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $70,165 1,385,964
kWh
Electricity Demand $34,537 2,958
kW-mo/yr
Electricity Fees $3,514 -
TOTAL YEARLY COSTS $108,216
RECOMMENDED SAVINGS* $29,816 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $9,720

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $10,902 $82,500 $6,058
119,722
kWh
$4,844
-
kW-mo/yr
-
02 2.5195: Change product design to reduce energy requirements $8,800 $31,000 $6,686
132,134
kWh
$2,114
-
kW-mo/yr
-
03 2.4157: Establish a predictive maintenance program $3,788 $1,000 $3,052
60,314
kWh
$2,126
-
kW-mo/yr
$(-1,390.0)
04 2.7142: Utilize higher efficiency lamps and/or ballasts $1,983 $2,015 $1,317
26,034
kWh
$666
-
kW-mo/yr
-
05 2.7142: Utilize higher efficiency lamps and/or ballasts $1,808 $2,250 $1,376
27,195
kWh
$432
-
kW-mo/yr
-
06 2.4151: Develop a repair/replace policy $1,406 $617 $515
10,178
kWh
$1,191
-
kW-mo/yr
$(-300.0)
07 2.4313: Provide proper maintenance of motor driven equipment $735 $4,320 $618
12,214
kWh
$117
-
kW-mo/yr
-
08 2.4231: Reduce the pressure of compressed air to the minimum required $394 $60 $184
3,637
kWh
$210
-
kW-mo/yr
-
TOTAL RECOMMENDED $29,816 $123,762 $19,806
391,428
kWh
$11,700
-
kW-mo/yr
$(-1,690.0)
TOTAL IMPLEMENTED $9,720 $10,202 $6,878
135,935
kWh
$4,532
-
kW-mo/yr
$(-1,690.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs