ITAC Assessment: LT8421
ITAC logo
ITAC Assessment: LT8421
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product Plumbing Repairs HVAC Installation Electric Work
NAICS 238220: Plumbing, Heating, and Air-Conditioning Contractors
SIC 1711: Plumbing, Heating and Air-Conditioning
Sales Range $1
M
to 5
M
# of Employees 18
Plant Area 2,500
ft2
Annual Production 4,000
units
Production Hrs. Annual 2,080
hrs
Location (State) Louisiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $3,417 37,007
kWh
Electricity Demand $170 62
kW-mo/yr
LPG $2,230 190
MMBtu
Other Gas $49,140 2,160
MMBtu
Waste Disposal Costs
Water Usage $201 43
Tgal
Water Disposal $127 43
Tgal
TOTAL YEARLY COSTS $55,284
RECOMMENDED SAVINGS* $5,505 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Other Gas Savings Ancillary Material Cost Savings
01 2.8226: Increase efficiency of trucks $5,258 $22,624 - $4,906
-
MMBtu
$352
02 2.7444: Close holes and openings in building such as broken windows $237 $180 $237
2,571
kWh
- -
03 2.7135: Install occupancy sensors $11 $31 $11
123
kWh
- $(-0.5)
TOTAL RECOMMENDED $5,505 $22,835 $248
2,693
kWh
$4,906
-
MMBtu
$351
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs