ITAC Assessment: WV0526
ITAC logo
ITAC Assessment: WV0526
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2016
Principal Product decorative metal coating
NAICS 332812: Metal Coating, Engraving (except Jewelry and Silverware), and Allied Services to Manufacturers
SIC 3479: Coating, Engraving, and Allied Services, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 92
Plant Area 453,640
ft2
Annual Production 30,000,000
lb
Production Hrs. Annual 2,288
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $227,564 5,090,850
kWh
Electricity Demand $293,918 14,733
kW-mo/yr
Natural Gas $436,131 66,820
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $63,518 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $61,842

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $31,798 $78,534 $9,534
213,294
kWh
$22,264
-
kW-mo/yr
- -
02 2.7231: Use radiant heater for spot heating $24,527 $35,260 - - $24,527
-
MMBtu
-
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,991 $180 $594
13,279
kWh
$1,397
-
kW-mo/yr
- -
04 2.4151: Develop a repair/replace policy $1,872 $1,122 $728
16,281
kWh
$1,696
-
kW-mo/yr
- $(-552.0)
05 2.7142: Utilize higher efficiency lamps and/or ballasts $1,676 $3,122 $499
11,169
kWh
$1,177
-
kW-mo/yr
- -
06 2.4231: Reduce the pressure of compressed air to the minimum required $1,654 $46 $497
11,129
kWh
$1,157
-
kW-mo/yr
- -
TOTAL RECOMMENDED $63,518 $118,264 $11,852
265,152
kWh
$27,691
-
kW-mo/yr
$24,527
-
MMBtu
$(-552.0)
TOTAL IMPLEMENTED $61,842 $115,142 $11,353
253,983
kWh
$26,514
-
kW-mo/yr
$24,527
-
MMBtu
$(-552.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs