Assessment Year | 2016 |
---|---|
Principal Product | Sewage Treatment |
NAICS | 221320: Sewage Treatment Facilities |
SIC | 4952: Sewerage Systems |
Sales Range | $5 M to 10M |
# of Employees | 82 |
Plant Area |
1,400,000
ft2
|
Annual Production | 1,350,500
Tgal
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | West Virginia |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $311,376 | 7,047,270 |
kWh
|
$0.044 |
Electricity Demand | $168,340 | 13,520 |
kW-mo/yr
|
$12.45 |
Natural Gas | $71,839 | 8,999 |
MMBtu
|
$7.98 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $80,947 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $15,531 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.3415: Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat | $51,512 | $200,000 |
$37,170
840,960
kWh
|
$14,342
-
kW-mo/yr
|
- | - | |
02 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $13,250 | $51,000 |
$13,250
299,776
kWh
|
- | - | - | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $5,412 | $4,664 |
$3,906
88,371
kWh
|
$1,506
-
kW-mo/yr
|
- | - | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $4,867 | $2,686 |
$3,513
79,452
kWh
|
$1,354
-
kW-mo/yr
|
- | - | |
05 | 2.4151: Develop a repair/replace policy | $2,819 | $1,235 |
$2,247
50,826
kWh
|
$872
-
kW-mo/yr
|
- | $(-300.0) | |
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,279 | $4,985 |
$632
14,296
kWh
|
$647
-
kW-mo/yr
|
- | - | |
07 | 2.1233: Analyze flue gas for proper air/fuel ratio | $1,154 | $500 | - | - |
$1,229
-
MMBtu
|
$(-75.0) | |
08 | 2.1221: Replace obsolete burners with more efficient ones | $654 | $2,700 | - | - |
$654
-
MMBtu
|
- | |
TOTAL RECOMMENDED | $80,947 | $267,770 |
$60,718
1,373,681
kWh
|
$18,721
-
kW-mo/yr
|
$1,883
-
MMBtu
|
$(-375.0) | ||
TOTAL IMPLEMENTED | $15,531 | $14,070 |
$10,298
232,945
kWh
|
$4,379
-
kW-mo/yr
|
$1,229
-
MMBtu
|
$(-375.0) | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs