ITAC Assessment: AM0859
ITAC logo
ITAC Assessment: AM0859
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2022
Principal Product Chemicals
NAICS 325180: Other Basic Inorganic Chemical Manufacturing
SIC 2819: Industrial Inorganic Chemicals, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 130
Plant Area 150,000
ft2
Annual Production 200,000,000
lb
Production Hrs. Annual 8,760
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $380,567 9,718,573
kWh
Electricity Demand $144,070 17,556
kW-mo/yr
Electricity Fees $3,644 -
Natural Gas $1,636,381 252,899
MMBtu
TOTAL YEARLY COSTS $2,164,662
RECOMMENDED SAVINGS* $437,918 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $357,150

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Ancillary Material Cost Savings One-time Revenue or Avoided Cost Savings
01 2.8121: Apply for tax-free status for energy purchases $355,500 $15,000 - - - - $96,300 $259,200
02 2.2113: Repair or replace steam traps $42,200 $2,460 - - - $42,200
-
MMBtu
- -
03 2.2135: Repair and eliminate steam leaks $28,000 $4,920 - - - $28,000
-
MMBtu
- -
04 2.3212: Optimize plant power factor $8,300 $36,700 - $8,300
-
kW-mo/yr
- - - -
05 2.4231: Reduce the pressure of compressed air to the minimum required $2,210 $40 $1,690
43,300
kWh
$520
-
kW-mo/yr
- - - -
06 2.7132: Install timers on light switches in little used areas $1,650 $160 $1,025
26,300
kWh
$625
-
kW-mo/yr
- - - -
07 2.8114: Change rate schedules or other changes in utility service $58 - - - $58 - - -
TOTAL RECOMMENDED $437,918 $59,280 $2,715
69,600
kWh
$9,445
-
kW-mo/yr
$58 $70,200
-
MMBtu
$96,300 $259,200
TOTAL IMPLEMENTED $357,150 $15,160 $1,025
26,300
kWh
$625
-
kW-mo/yr
- - $96,300 $259,200
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Ancillary Material Cost Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs