Assessment Year | 2015 |
---|---|
Principal Product | Metal Finishing |
NAICS | 332813: Electroplating, Plating, Polishing, Anodizing, and Coloring |
SIC | 3471: Electroplating, Plating, Polishing, Anodizing, and Coloring |
Sales Range | $1 M to 5M |
# of Employees | 40 |
Plant Area |
20,000
ft2
|
Annual Production | 8,000,000
lb
|
Production Hrs. Annual | 3,952
hrs
|
Location (State) | Ohio |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $65,676 | 590,740 |
kWh
|
$0.11 |
Electricity Demand | $14,595 | 2,112 |
kW-mo/yr
|
$6.91 |
Natural Gas | $107,288 | 19,293 |
MMBtu
|
$5.56 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $32,832 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $13,552 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.2123: Insulate feedwater tank | $13,405 | $6,253 | - | - |
$13,405
-
MMBtu
|
- | |
02 | 2.1233: Analyze flue gas for proper air/fuel ratio | $4,569 | $1,700 | - | - |
$4,954
-
MMBtu
|
$(-385.0) | |
03 | 2.7135: Install occupancy sensors | $4,682 | $1,278 |
$3,914
35,199
kWh
|
$768
-
kW-mo/yr
|
- | - | |
04 | 2.1221: Replace obsolete burners with more efficient ones | $4,181 | $11,220 | - | - |
$4,181
-
MMBtu
|
- | |
05 | 2.7135: Install occupancy sensors | $1,835 | $920 |
$1,544
13,884
kWh
|
$291
-
kW-mo/yr
|
- | - | |
06 | 2.4239: Eliminate or reduce compressed air usage | $1,694 | $6,400 |
$1,424
12,806
kWh
|
$270
-
kW-mo/yr
|
- | - | |
07 | 2.6232: Install set-back timers | $1,310 | $1,175 |
$1,206
10,841
kWh
|
$104
-
kW-mo/yr
|
- | - | |
08 | 2.7135: Install occupancy sensors | $975 | $3,180 |
$795
7,148
kWh
|
$180
-
kW-mo/yr
|
- | - | |
09 | 2.4231: Reduce the pressure of compressed air to the minimum required | $181 | $35 |
$153
1,379
kWh
|
$28
-
kW-mo/yr
|
- | - | |
TOTAL RECOMMENDED | $32,832 | $32,161 |
$9,036
81,257
kWh
|
$1,641
-
kW-mo/yr
|
$22,540
-
MMBtu
|
$(-385.0) | ||
TOTAL IMPLEMENTED | $13,552 | $8,288 |
$7,612
68,451
kWh
|
$1,371
-
kW-mo/yr
|
$4,954
-
MMBtu
|
$(-385.0) | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs