ITAC Assessment: AR0020
ITAC logo
ITAC Assessment: AR0020
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product Multi-wall bags
NAICS
n/a
SIC 2674: Uncoated Paper and Multiwall Bags
Sales Range $50
M
to 100
M
# of Employees 340
Plant Area 244,000
ft2
Annual Production 46,000
ton
Production Hrs. Annual 8,760
hrs
Location (State) Arkansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $750,345 13,374,854
kWh
Natural Gas $148,738 44,907
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $23,814 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $23,814

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,988 $250 $4,988
88,804
kWh
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $6,843 $1,300 $6,843
121,923
kWh
03 2.1223: Install smaller boiler (increase high fire duty cycle) $3,547 $5,250 $3,547
48,359
kWh
04 2.4133: Use most efficient type of electric motors $2,351 $2,100 $2,351
41,911
kWh
05 2.7142: Utilize higher efficiency lamps and/or ballasts $3,102 $712 $3,102
55,393
kWh
06 2.7111: Reduce illumination to minimum necessary levels $2,983 $670 $2,983
53,048
kWh
TOTAL RECOMMENDED $23,814 $10,282 $23,814
409,438
kWh
TOTAL IMPLEMENTED $23,814 $10,282 $23,814
409,438
kWh
Yearly Savings* Imp'd Cost* Electricity Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs