ITAC Assessment: MS0253
ITAC logo
ITAC Assessment: MS0253
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2004
Principal Product Belt Conveyor Idlers
NAICS 333922: Conveyor and Conveying Equipment Manufacturing
SIC 3535: Conveyors and Conveying Equipment
Sales Range $10
M
to 50
M
# of Employees 63
Plant Area 146,232
ft2
Annual Production 9,000,000
lb
Production Hrs. Annual 1,920
hrs
Location (State) Mississippi

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $70,789 1,180,200
kWh
Electricity Demand $13,269 6,349
kW-mo/yr
Electricity Fees $1,309 -
Natural Gas $30,793 6,349
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $9,777 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,577

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Other Liquid (non-haz) Savings Solid Waste (non-haz) Savings One-time Revenue or Avoided Cost Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $4,032 $11 $3,213
58,109
kWh
$759
-
kW-mo/yr
$60 - - - -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $1,649 $4,689 $1,316
23,792
kWh
$309
-
kW-mo/yr
$24 - - - -
03 2.7231: Use radiant heater for spot heating $1,526 $4,000 - - - $1,526
-
MMBtu
- - -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $853 $288 $840
15,184
kWh
- $13 - - - -
05 3.6124: Burn waste oil for heat $703 $2,190 - - - $303
-
MMBtu
$400
-
gal
- -
06 2.7261: Install timers and/or thermostats $480 $708 $473
8,548
kWh
- $7 - - - -
07 3.1193: Convert from batch operation to continuous processing $336 $68 - - - - - $224
-
lb
$112
08 2.4111: Utilize energy-efficient belts and other improved mechanisms $198 $735 $157
2,840
kWh
$38
-
kW-mo/yr
$3 - - - -
TOTAL RECOMMENDED $9,777 $12,689 $5,999
108,473
kWh
$1,106
-
kW-mo/yr
$107 $1,829
-
MMBtu
$400
-
gal
$224
-
lb
$112
TOTAL IMPLEMENTED $2,577 $5,023 $997
18,024
kWh
$38
-
kW-mo/yr
$16 $1,526
-
MMBtu
- - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Other Liquid (non-haz) Savings Solid Waste (non-haz) Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs