ITAC Assessment: UL0143
ITAC logo
ITAC Assessment: UL0143
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Corrugated Shipping Containers
NAICS
n/a
SIC 2653: Corrugated and Solid Fiber Boxes
Sales Range $10
M
to 50
M
# of Employees 140
Plant Area 140,000
ft2
Annual Production 48,140
ton
Production Hrs. Annual 7,488
hrs
Location (State) Kentucky

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $272,261 5,737,398
kWh
Natural Gas $199,990 75,105
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $30,997 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $4,882 $5,564 n/a $4,882
102,872
kWh
02 2.4133: Use most efficient type of electric motors $957 $1,539 n/a $957
20,223
kWh
03 2.3212: Optimize plant power factor $20,656 $19,584 n/a $20,656
-
kWh
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,980 $40 n/a $1,980
41,618
kWh
05 2.4231: Reduce the pressure of compressed air to the minimum required $2,522 $20 n/a $2,522
53,048
kWh
TOTAL RECOMMENDED $30,997 $26,747 $30,997
217,761
kWh
TOTAL IMPLEMENTED - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs