ITAC Assessment: WV0512
ITAC logo
ITAC Assessment: WV0512
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2015
Principal Product Faced Brick
NAICS 327120: Clay Building Material and Refractories Manufacturing
SIC 3251: Brick and Structural Clay Tile
Sales Range $1
M
to 5
M
# of Employees 40
Plant Area 100,000
ft2
Annual Production 40,000
ton
Production Hrs. Annual 5,880
hrs
Location (State) West Virginia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $132,280 3,008,662
kWh
Electricity Demand $120,631 9,916
kW-mo/yr
Natural Gas $551,339 92,587
MMBtu
Coal $35,650 6,543
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $61,832 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $27,944

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Coal Savings Personnel Changes Savings
01 2.4111: Utilize energy-efficient belts and other improved mechanisms $29,352 $75,000 - - $28,002
-
MMBtu
$1,350
-
MMBtu
-
02 2.1233: Analyze flue gas for proper air/fuel ratio $13,436 $500 - - $14,036
-
MMBtu
- $(-600.0)
03 2.4224: Upgrade controls on compressors $4,536 $20,300 $2,723
61,889
kWh
$1,813
-
kW-mo/yr
- - -
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $4,356 - $2,786
63,312
kWh
$1,570
-
kW-mo/yr
- - -
05 2.4157: Establish a predictive maintenance program $3,325 $1,000 $3,521
80,020
kWh
$1,984
-
kW-mo/yr
- - $(-2,180.0)
06 2.4231: Reduce the pressure of compressed air to the minimum required $2,537 $80 $1,624
36,902
kWh
$913
-
kW-mo/yr
- - -
07 2.7142: Utilize higher efficiency lamps and/or ballasts $2,467 $549 $1,566
35,601
kWh
$901
-
kW-mo/yr
- - -
08 2.2511: Insulate bare equipment $1,061 $468 - - $1,023
-
MMBtu
$38
-
MMBtu
-
09 2.4151: Develop a repair/replace policy $762 $554 $792
18,005
kWh
$450
-
kW-mo/yr
- - $(-480.0)
TOTAL RECOMMENDED $61,832 $98,451 $13,012
295,729
kWh
$7,631
-
kW-mo/yr
$43,061
-
MMBtu
$1,388
-
MMBtu
$(-3,260.0)
TOTAL IMPLEMENTED $27,944 $3,151 $10,289
233,840
kWh
$5,818
-
kW-mo/yr
$15,059
-
MMBtu
$38
-
MMBtu
$(-3,260.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Coal Savings Personnel Changes Savings