ITAC Assessment: WV0501
ITAC logo
ITAC Assessment: WV0501
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2015
Principal Product Hardwood Lumber
NAICS 321912: Cut Stock, Resawing Lumber, and Planing
SIC 2421: Sawmills and Planing Mills, General
Sales Range $10
M
to 50
M
# of Employees 30
Plant Area 200,000
ft2
Annual Production 1,400,000
pieces
Production Hrs. Annual 2,040
hrs
Location (State) West Virginia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $179,728 3,166,800
kWh
Electricity Demand $29,827 6,520
kW-mo/yr
Wood $233,600 116,800
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $38,352 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $13,280

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Wood Savings Personnel Changes Savings
01 2.1116: Improve combustion control capability $12,166 $24,000 - - $12,166
-
MMBtu
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $6,534 $26,699 $4,436
78,100
kWh
$2,098
-
kW-mo/yr
- -
03 2.4157: Establish a predictive maintenance program $5,928 $1,000 $5,718
100,675
kWh
$2,705
-
kW-mo/yr
- $(-2,495.0)
04 2.2113: Repair or replace steam traps $3,486 $5,200 - - $3,686
-
MMBtu
$(-200.0)
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $3,359 - $2,280
40,143
kWh
$1,079
-
kW-mo/yr
- -
06 2.2135: Repair and eliminate steam leaks $2,432 $400 - - $2,432
-
MMBtu
-
07 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $1,751 $7,185 $1,189
20,940
kWh
$562
-
kW-mo/yr
- -
08 2.2511: Insulate bare equipment $1,262 $2,533 - - $1,262
-
MMBtu
-
09 2.4151: Develop a repair/replace policy $1,062 $649 $965
16,989
kWh
$457
-
kW-mo/yr
- $(-360.0)
10 2.7142: Utilize higher efficiency lamps and/or ballasts $372 $327 $253
4,450
kWh
$119
-
kW-mo/yr
- -
TOTAL RECOMMENDED $38,352 $67,993 $14,841
261,297
kWh
$7,020
-
kW-mo/yr
$19,546
-
MMBtu
$(-3,055.0)
TOTAL IMPLEMENTED $13,280 $7,576 $6,936
122,114
kWh
$3,281
-
kW-mo/yr
$6,118
-
MMBtu
$(-3,055.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Wood Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs