Assessment Year | 2015 |
---|---|
Principal Product | Hardwood Lumber |
NAICS | 321912: Cut Stock, Resawing Lumber, and Planing |
SIC | 2421: Sawmills and Planing Mills, General |
Sales Range | $10 M to 50M |
# of Employees | 30 |
Plant Area |
200,000
ft2
|
Annual Production | 1,400,000
pieces
|
Production Hrs. Annual | 2,040
hrs
|
Location (State) | West Virginia |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $179,728 | 3,166,800 |
kWh
|
$0.057 |
Electricity Demand | $29,827 | 6,520 |
kW-mo/yr
|
$4.57 |
Wood | $233,600 | 116,800 |
MMBtu
|
$2.00 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $38,352 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $13,280 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Wood Savings | Personnel Changes Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.1116: Improve combustion control capability | $12,166 | $24,000 | - | - |
$12,166
-
MMBtu
|
- | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $6,534 | $26,699 |
$4,436
78,100
kWh
|
$2,098
-
kW-mo/yr
|
- | - | |
03 | 2.4157: Establish a predictive maintenance program | $5,928 | $1,000 |
$5,718
100,675
kWh
|
$2,705
-
kW-mo/yr
|
- | $(-2,495.0) | |
04 | 2.2113: Repair or replace steam traps | $3,486 | $5,200 | - | - |
$3,686
-
MMBtu
|
$(-200.0) | |
05 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $3,359 | - |
$2,280
40,143
kWh
|
$1,079
-
kW-mo/yr
|
- | - | |
06 | 2.2135: Repair and eliminate steam leaks | $2,432 | $400 | - | - |
$2,432
-
MMBtu
|
- | |
07 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $1,751 | $7,185 |
$1,189
20,940
kWh
|
$562
-
kW-mo/yr
|
- | - | |
08 | 2.2511: Insulate bare equipment | $1,262 | $2,533 | - | - |
$1,262
-
MMBtu
|
- | |
09 | 2.4151: Develop a repair/replace policy | $1,062 | $649 |
$965
16,989
kWh
|
$457
-
kW-mo/yr
|
- | $(-360.0) | |
10 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $372 | $327 |
$253
4,450
kWh
|
$119
-
kW-mo/yr
|
- | - | |
TOTAL RECOMMENDED | $38,352 | $67,993 |
$14,841
261,297
kWh
|
$7,020
-
kW-mo/yr
|
$19,546
-
MMBtu
|
$(-3,055.0) | ||
TOTAL IMPLEMENTED | $13,280 | $7,576 |
$6,936
122,114
kWh
|
$3,281
-
kW-mo/yr
|
$6,118
-
MMBtu
|
$(-3,055.0) | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Wood Savings | Personnel Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs