Assessment Year | 2017 |
---|---|
Principal Product | Finished Wines |
NAICS | 312130: Wineries |
SIC | 2084: Wines, Brandy, and Brandy Spirits |
Sales Range | $100 M to 500M |
# of Employees | 100 |
Plant Area |
600,000
ft2
|
Annual Production | 18,500
Tgal
|
Production Hrs. Annual | 6,408
hrs
|
Location (State) | California |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $569,139 | 6,591,372 |
kWh
|
$0.086 |
Electricity Demand | $388,859 | 21,132 |
kW-mo/yr
|
$18.40 |
Natural Gas | $21,807 | 1,886 |
MMBtu
|
$11.57 |
TOTAL YEARLY COSTS | $979,805 | |||
RECOMMENDED SAVINGS* | $197,836 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $197,836 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $3,318 | - |
$3,990
46,211
kWh
|
- | - | $(-672.0) | - | |
02 | 2.2694: Use highest temperature for chilling or cold storage | $7,895 | $560 |
$8,455
97,917
kWh
|
- | - | $(-560.0) | - | |
03 | 2.2135: Repair and eliminate steam leaks | $1,567 | $156 |
$1,567
18,148
kWh
|
- | - | - | - | |
04 | 2.2511: Insulate bare equipment | $8,398 | $3,902 |
$604
6,996
kWh
|
- |
$7,794
-
MMBtu
|
- | - | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $116,456 | $172,681 |
$63,450
734,805
kWh
|
$31,858
-
kW-mo/yr
|
- | $22,714 | $(-1,566.0) | |
06 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $5,369 | $12,526 |
$6,085
70,467
kWh
|
$2,761
-
kW-mo/yr
|
$(-3,477.0)
-
MMBtu
|
- | - | |
07 | 2.2621: Modify refrigeration system to operate at a lower pressure | $54,833 | $312,470 |
$54,833
635,003
kWh
|
- | - | - | - | |
TOTAL RECOMMENDED | $197,836 | $502,295 |
$138,984
1,609,547
kWh
|
$34,619
-
kW-mo/yr
|
$4,317
-
MMBtu
|
$21,482 | $(-1,566.0) | ||
TOTAL IMPLEMENTED | $197,836 | $502,295 |
$138,984
1,609,547
kWh
|
$34,619
-
kW-mo/yr
|
$4,317
-
MMBtu
|
$21,482 | $(-1,566.0) | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs