ITAC Assessment: SF0507
ITAC logo
ITAC Assessment: SF0507
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2017
Principal Product Finished Wines
NAICS 312130: Wineries
SIC 2084: Wines, Brandy, and Brandy Spirits
Sales Range $100
M
to 500
M
# of Employees 100
Plant Area 600,000
ft2
Annual Production 18,500
Tgal
Production Hrs. Annual 6,408
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $569,139 6,591,372
kWh
Electricity Demand $388,859 21,132
kW-mo/yr
Natural Gas $21,807 1,886
MMBtu
TOTAL YEARLY COSTS $979,805
RECOMMENDED SAVINGS* $197,836 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $197,836

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,318 - $3,990
46,211
kWh
- - $(-672.0) -
02 2.2694: Use highest temperature for chilling or cold storage $7,895 $560 $8,455
97,917
kWh
- - $(-560.0) -
03 2.2135: Repair and eliminate steam leaks $1,567 $156 $1,567
18,148
kWh
- - - -
04 2.2511: Insulate bare equipment $8,398 $3,902 $604
6,996
kWh
- $7,794
-
MMBtu
- -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $116,456 $172,681 $63,450
734,805
kWh
$31,858
-
kW-mo/yr
- $22,714 $(-1,566.0)
06 2.1311: Replace electrically-operated equipment with fossil fuel equipment $5,369 $12,526 $6,085
70,467
kWh
$2,761
-
kW-mo/yr
$(-3,477.0)
-
MMBtu
- -
07 2.2621: Modify refrigeration system to operate at a lower pressure $54,833 $312,470 $54,833
635,003
kWh
- - - -
TOTAL RECOMMENDED $197,836 $502,295 $138,984
1,609,547
kWh
$34,619
-
kW-mo/yr
$4,317
-
MMBtu
$21,482 $(-1,566.0)
TOTAL IMPLEMENTED $197,836 $502,295 $138,984
1,609,547
kWh
$34,619
-
kW-mo/yr
$4,317
-
MMBtu
$21,482 $(-1,566.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs