Assessment Year | 2015 |
---|---|
Principal Product | Automotive sound absorbent |
NAICS | 336211: Motor Vehicle Body Manufacturing |
SIC | 3714: Motor Vehicle Parts and Accessories |
Sales Range | $10 M to 50M |
# of Employees | 55 |
Plant Area |
45,000
ft2
|
Annual Production | 3,000,000
pieces
|
Production Hrs. Annual | 6,120
hrs
|
Location (State) | Ohio |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $214,453 | 2,129,268 |
kWh
|
$0.10 |
Electricity Demand | $41,577 | 6,196 |
kW-mo/yr
|
$6.71 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $64,310 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $12,971 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.2511: Insulate bare equipment | $23,483 | $3,220 |
$20,772
206,272
kWh
|
$2,711
-
kW-mo/yr
|
- | - | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $17,029 | $21,056 |
$15,063
149,586
kWh
|
$1,966
-
kW-mo/yr
|
- | - | |
03 | 2.8112: Combine utility meters | $4,906 | $3,200 | - | - | - | $4,906 | |
04 | 2.4157: Establish a predictive maintenance program | $4,878 | $1,000 |
$6,289
62,457
kWh
|
$819
-
kW-mo/yr
|
$(-2,230.0) | - | |
05 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $4,187 | - | - |
$4,187
-
kW-mo/yr
|
- | - | |
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,695 | $3,343 |
$3,266
32,434
kWh
|
$429
-
kW-mo/yr
|
- | - | |
07 | 2.4231: Reduce the pressure of compressed air to the minimum required | $2,825 | $20 |
$2,496
24,783
kWh
|
$329
-
kW-mo/yr
|
- | - | |
08 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $1,734 | $5,450 |
$1,533
15,226
kWh
|
$201
-
kW-mo/yr
|
- | - | |
09 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $792 | - |
$698
6,936
kWh
|
$94
-
kW-mo/yr
|
- | - | |
10 | 2.4151: Develop a repair/replace policy | $781 | $569 |
$1,327
13,175
kWh
|
$174
-
kW-mo/yr
|
$(-720.0) | - | |
TOTAL RECOMMENDED | $64,310 | $37,858 |
$51,444
510,869
kWh
|
$10,910
-
kW-mo/yr
|
$(-2,950.0) | $4,906 | ||
TOTAL IMPLEMENTED | $12,971 | $4,932 |
$14,076
139,785
kWh
|
$1,845
-
kW-mo/yr
|
$(-2,950.0) | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs