ITAC Assessment: WV0492
ITAC logo
ITAC Assessment: WV0492
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2014
Principal Product Door Hardware
NAICS 332510: Hardware Manufacturing
SIC 3429: Hardware, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 125
Plant Area 88,000
ft2
Annual Production 2,000,000
pieces
Production Hrs. Annual 4,186
hrs
Location (State) Pennsylvania

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $123,473 1,804,643
kWh
Electricity Demand $35,467 6,767
kW-mo/yr
Electricity Fees $495 -
LPG $53,413 2,443
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $38,579 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $26,064

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings LPG Savings Personnel Changes Savings
01 2.1233: Analyze flue gas for proper air/fuel ratio $8,061 $1,700 - - $8,241
-
MMBtu
$(-180.0)
02 2.2514: Cover open tanks $7,268 $1,145 $6,215
90,830
kWh
$1,053
-
kW-mo/yr
- -
03 2.6218: Turn off equipment when not in use $6,370 - $5,222
76,328
kWh
$1,148
-
kW-mo/yr
- -
04 2.7231: Use radiant heater for spot heating $5,334 $11,360 - - $5,334
-
MMBtu
-
05 2.2414: Use waste heat from hot flue gases to preheat $3,126 $3,000 - - $3,126
-
MMBtu
-
06 2.4239: Eliminate or reduce compressed air usage $2,774 $8,160 $2,276
33,267
kWh
$498
-
kW-mo/yr
- -
07 2.4157: Establish a predictive maintenance program $1,914 $1,000 $2,405
35,147
kWh
$529
-
kW-mo/yr
- $(-1,020.0)
08 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,697 $338 $1,393
20,360
kWh
$304
-
kW-mo/yr
- -
09 2.4231: Reduce the pressure of compressed air to the minimum required $811 $30 $664
9,702
kWh
$147
-
kW-mo/yr
- -
10 2.7142: Utilize higher efficiency lamps and/or ballasts $557 $1,916 $457
6,680
kWh
$100
-
kW-mo/yr
- -
11 2.4151: Develop a repair/replace policy $482 $356 $541
7,908
kWh
$121
-
kW-mo/yr
- $(-180.0)
12 2.4239: Eliminate or reduce compressed air usage $185 $700 $154
2,255
kWh
$31
-
kW-mo/yr
- -
TOTAL RECOMMENDED $38,579 $29,705 $19,327
282,477
kWh
$3,931
-
kW-mo/yr
$16,701
-
MMBtu
$(-1,380.0)
TOTAL IMPLEMENTED $26,064 $18,315 $13,441
196,447
kWh
$2,636
-
kW-mo/yr
$11,367
-
MMBtu
$(-1,380.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings LPG Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs