ITAC Assessment: WV0491
ITAC logo
ITAC Assessment: WV0491
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2014
Principal Product Molded Rubber Products
NAICS 326299: All Other Rubber Product Manufacturing
SIC 3069: Fabricated Rubber Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 75
Plant Area 60,000
ft2
Annual Production 1,300,000
lb
Production Hrs. Annual 6,240
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $281,572 3,152,070
kWh
Electricity Demand $55,668 8,205
kW-mo/yr
Natural Gas $9,296 1,362
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $33,134 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $21,813

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $9,493 $14,500 $8,286
92,762
kWh
$1,207
-
kW-mo/yr
- -
02 2.4157: Establish a predictive maintenance program $6,341 $1,000 $6,240
69,854
kWh
$909
-
kW-mo/yr
- $(-808.0)
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $5,694 $263 $4,969
55,628
kWh
$725
-
kW-mo/yr
- -
04 2.6218: Turn off equipment when not in use $4,434 $500 $3,871
43,333
kWh
$563
-
kW-mo/yr
- -
05 2.4239: Eliminate or reduce compressed air usage $3,124 $2,208 $2,724
30,498
kWh
$400
-
kW-mo/yr
- -
06 2.4151: Develop a repair/replace policy $1,234 $593 $1,337
14,969
kWh
$197
-
kW-mo/yr
- $(-300.0)
07 2.7142: Utilize higher efficiency lamps and/or ballasts $971 $3,700 $801
8,970
kWh
$170
-
kW-mo/yr
- -
08 2.4239: Eliminate or reduce compressed air usage $541 $235 $473
5,291
kWh
$68
-
kW-mo/yr
- -
09 2.7231: Use radiant heater for spot heating $485 $1,450 - - $485
-
MMBtu
-
10 2.4231: Reduce the pressure of compressed air to the minimum required $445 $25 $391
4,381
kWh
$54
-
kW-mo/yr
- -
11 2.1233: Analyze flue gas for proper air/fuel ratio $372 $500 - - $410
-
MMBtu
$(-38.0)
TOTAL RECOMMENDED $33,134 $24,974 $29,092
325,686
kWh
$4,293
-
kW-mo/yr
$895
-
MMBtu
$(-1,146.0)
TOTAL IMPLEMENTED $21,813 $4,824 $20,005
223,954
kWh
$2,916
-
kW-mo/yr
- $(-1,108.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs