ITAC Assessment: AS0598
ITAC logo
ITAC Assessment: AS0598
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product fleet vehicles
NAICS 336390: Other Motor Vehicle Parts Manufacturing
SIC 3714: Motor Vehicle Parts and Accessories
Sales Range $1
M
to 5
M
# of Employees 35
Plant Area 23,000
ft2
Annual Production 300
units
Production Hrs. Annual 3,012
hrs
Location (State) Nevada

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $26,823 269,180
kWh
Electricity Demand $6,752 807
kW-mo/yr
Electricity Fees $1,872 -
Natural Gas $15,601 957
MMBtu
Fuel Oil #1 $292,100 6,282
MMBtu
Fuel Oil #2 $153,803 7,961
MMBtu
Other Energy $2,229 1
MMBtu
Waste Disposal Costs
Water Usage $11,328 1
Tgal
TOTAL YEARLY COSTS $510,508
RECOMMENDED SAVINGS* $46,718 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Ancillary Material Cost Savings
01 2.9114: Use solar heat to make electricty $35,167 $204,030 $35,906
360,501
kWh
$2,845
-
kW-mo/yr
- $(-3,584.0)
02 2.7292: Lower ceiling to reduce conditioned space $5,201 $936 - - $5,201
-
MMBtu
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $4,406 $6,171 $3,956
39,719
kWh
- - $450
04 2.7226: Use computer programs to optimize hvac performance $1,696 $1,129 $938
9,421
kWh
$318
-
kW-mo/yr
$440
-
MMBtu
-
05 2.6211: Conserve energy by efficient use of vending machines $248 $144 $131
1,319
kWh
$117
-
kW-mo/yr
- -
TOTAL RECOMMENDED $46,718 $212,410 $40,931
410,960
kWh
$3,280
-
kW-mo/yr
$5,641
-
MMBtu
$(-3,134.0)
TOTAL IMPLEMENTED - - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs