| Assessment Year | 2025 |
|---|---|
| Principal Product | fleet vehicles |
| NAICS | 336390: Other Motor Vehicle Parts Manufacturing |
| SIC | 3714: Motor Vehicle Parts and Accessories |
| Sales Range | $1 M to 5M |
| # of Employees | 35 |
| Plant Area |
23,000
ft2
|
| Annual Production | 300
units
|
| Production Hrs. Annual | 3,012
hrs
|
| Location (State) | Nevada |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | ||
|---|---|---|---|---|---|
| Electricity Usage | $26,823 | 269,180 |
kWh
|
$0.100 | |
| Electricity Demand | $6,752 | 807 |
kW-mo/yr
|
$8.37 | |
| Electricity Fees | $1,872 | - |
|
- | |
| Natural Gas | $15,601 | 957 |
MMBtu
|
$16.30 | |
| Fuel Oil #1 | $138,297 | 6,283 |
MMBtu
|
$22.01 | |
| Fuel Oil #2 | $153,803 | 7,961 |
MMBtu
|
$19.32 | |
| Other Energy | $2,229 | 1 |
MMBtu
|
$2,229.00 | |
| Waste Disposal Costs | |||||
| Water Usage | $11,328 | 1 |
Tgal
|
$11,051.71 | |
| TOTAL YEARLY COSTS | $356,705 | ||||
| RECOMMENDED SAVINGS* | $46,718 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
| IMPLEMENTED SAVINGS* | - | ||||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Ancillary Material Cost Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 2.9114: Use solar heat to make electricty | $35,167 | $204,030 |
$35,906
360,501
kWh
|
$2,845
-
kW-mo/yr
|
- | $(-3,584.0) | |
| 02 | 2.7292: Lower ceiling to reduce conditioned space | $5,201 | $936 | - | - |
$5,201
-
MMBtu
|
- | |
| 03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $4,406 | $6,171 |
$3,956
39,719
kWh
|
- | - | $450 | |
| 04 | 2.7226: Use computer programs to optimize hvac performance | $1,696 | $1,129 |
$938
9,421
kWh
|
$318
-
kW-mo/yr
|
$440
-
MMBtu
|
- | |
| 05 | 2.6211: Conserve energy by efficient use of vending machines | $248 | $144 |
$131
1,319
kWh
|
$117
-
kW-mo/yr
|
- | - | |
| TOTAL RECOMMENDED | $46,718 | $212,410 |
$40,931
410,960
kWh
|
$3,280
-
kW-mo/yr
|
$5,641
-
MMBtu
|
$(-3,134.0) | ||
| TOTAL IMPLEMENTED | - | - | - | - | - | - | ||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs