ITAC Assessment: MZ0076
ITAC logo
ITAC Assessment: MZ0076
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2012
Principal Product chemical
NAICS 325998: All Other Miscellaneous Chemical Product and Preparation Manufacturing
SIC 2819: Industrial Inorganic Chemicals, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 120
Plant Area 120,000
ft2
Annual Production 250
ton
Production Hrs. Annual 3,200
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,075,730 13,446,620
kWh
Natural Gas $343,320 30,330
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $114,911 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $6,188 $9,000 $3,404
42,560
kWh
$2,784
-
kW-mo/yr
-
02 2.6218: Turn off equipment when not in use $4,620 $150 $4,125
52,561
kWh
$495
-
kW-mo/yr
-
03 2.2628: Utilize a less expensive cooling method $59,645 $27,000 - $59,645
-
kW-mo/yr
-
04 2.7135: Install occupancy sensors $8,058 $2,310 $8,058
102,000
kWh
- -
05 2.1113: Reduce combustion air flow to optimum $36,400 $2,270 - - $36,400
-
MMBtu
TOTAL RECOMMENDED $114,911 $40,730 $15,587
197,121
kWh
$62,924
-
kW-mo/yr
$36,400
-
MMBtu
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs