Assessment Year | 2014 |
---|---|
Principal Product | Recreational Vehicles |
NAICS | 336213: Motor Home Manufacturing |
SIC | 3716: Motor Homes |
Sales Range | $10 M to 50M |
# of Employees | 225 |
Plant Area |
286,000
ft2
|
Annual Production | 950
units
|
Production Hrs. Annual | 2,100
hrs
|
Location (State) | Ohio |
View Case Study |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $135,824 | 2,663,400 |
kWh
|
$0.051 |
Electricity Demand | $121,299 | 8,987 |
kW-mo/yr
|
$13.50 |
Electricity Fees | $1,320 | - |
|
- |
Natural Gas | $136,190 | 19,822 |
MMBtu
|
$6.87 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $33,220 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $29,014 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.7313: Recycle air for heating, ventilation and air conditioning | $10,882 | $5,000 | - | - |
$10,882
-
MMBtu
|
- | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $8,883 | $16,722 |
$3,618
70,958
kWh
|
$5,265
-
kW-mo/yr
|
- | - | |
03 | 2.4157: Establish a predictive maintenance program | $3,124 | $1,000 |
$1,494
29,301
kWh
|
$2,255
-
kW-mo/yr
|
- | $(-625.0) | |
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,449 | $364 |
$977
19,160
kWh
|
$1,472
-
kW-mo/yr
|
- | - | |
05 | 2.2492: Use "heat wheel" or other heat exchanger to cross-exchange building exhaust air with make-up air | $2,052 | $10,000 |
$(-111.0)
(-2,186)
kWh
|
$(-162.0)
-
kW-mo/yr
|
$2,425
-
MMBtu
|
$(-100.0) | |
06 | 2.1233: Analyze flue gas for proper air/fuel ratio | $1,812 | $500 | - | - |
$2,501
-
MMBtu
|
$(-689.0) | |
07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,569 | $3,905 |
$624
12,243
kWh
|
$945
-
kW-mo/yr
|
- | - | |
08 | 2.1224: Replace boiler | $1,367 | $5,170 | - | - |
$1,367
-
MMBtu
|
- | |
09 | 2.2437: Recover waste heat from equipment | $701 | $1,075 | - | - |
$701
-
MMBtu
|
- | |
10 | 2.4231: Reduce the pressure of compressed air to the minimum required | $381 | $51 |
$151
2,959
kWh
|
$230
-
kW-mo/yr
|
- | - | |
TOTAL RECOMMENDED | $33,220 | $43,787 |
$6,753
132,435
kWh
|
$10,005
-
kW-mo/yr
|
$17,876
-
MMBtu
|
$(-1,414.0) | ||
TOTAL IMPLEMENTED | $29,014 | $41,661 |
$5,108
100,175
kWh
|
$7,520
-
kW-mo/yr
|
$17,175
-
MMBtu
|
$(-789.0) | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs