ITAC Assessment: WV0486
ITAC logo
ITAC Assessment: WV0486
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2014
Principal Product Structural Metal Towers
NAICS 332312: Fabricated Structural Metal Manufacturing
SIC 3441: Fabricated Structural Metal
Sales Range $10
M
to 50
M
# of Employees 60
Plant Area 140,000
ft2
Annual Production 1,300,000
lb
Production Hrs. Annual 4,420
hrs
Location (State) Pennsylvania

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $167,370 2,476,571
kWh
Electricity Demand $103,381 8,509
kW-mo/yr
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $49,532 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $21,125

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings
01 2.4322: Use or replace with energy efficient substitutes $27,561 $100,000 $18,521
274,064
kWh
$9,040
-
kW-mo/yr
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $14,397 $51,976 $9,671
143,100
kWh
$4,726
-
kW-mo/yr
-
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,550 $688 $2,384
35,281
kWh
$1,166
-
kW-mo/yr
-
04 2.4157: Establish a predictive maintenance program $2,358 $1,000 $2,675
39,583
kWh
$1,300
-
kW-mo/yr
$(-1,617.0)
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $846 $3,700 $846
12,520
kWh
- -
06 2.4231: Reduce the pressure of compressed air to the minimum required $558 $75 $376
5,557
kWh
$182
-
kW-mo/yr
-
07 2.4151: Develop a repair/replace policy $262 $519 $240
3,545
kWh
$122
-
kW-mo/yr
$(-100.0)
TOTAL RECOMMENDED $49,532 $157,958 $34,713
513,650
kWh
$16,536
-
kW-mo/yr
$(-1,717.0)
TOTAL IMPLEMENTED $21,125 $54,258 $15,346
227,066
kWh
$7,496
-
kW-mo/yr
$(-1,717.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs