Assessment Year | 2014 |
---|---|
Principal Product | Structural Metal Towers |
NAICS | 332312: Fabricated Structural Metal Manufacturing |
SIC | 3441: Fabricated Structural Metal |
Sales Range | $10 M to 50M |
# of Employees | 60 |
Plant Area |
140,000
ft2
|
Annual Production | 1,300,000
lb
|
Production Hrs. Annual | 4,420
hrs
|
Location (State) | Pennsylvania |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $167,370 | 2,476,571 |
kWh
|
$0.068 |
Electricity Demand | $103,381 | 8,509 |
kW-mo/yr
|
$12.15 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $49,532 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $21,125 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.4322: Use or replace with energy efficient substitutes | $27,561 | $100,000 |
$18,521
274,064
kWh
|
$9,040
-
kW-mo/yr
|
- | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $14,397 | $51,976 |
$9,671
143,100
kWh
|
$4,726
-
kW-mo/yr
|
- | |
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $3,550 | $688 |
$2,384
35,281
kWh
|
$1,166
-
kW-mo/yr
|
- | |
04 | 2.4157: Establish a predictive maintenance program | $2,358 | $1,000 |
$2,675
39,583
kWh
|
$1,300
-
kW-mo/yr
|
$(-1,617.0) | |
05 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $846 | $3,700 |
$846
12,520
kWh
|
- | - | |
06 | 2.4231: Reduce the pressure of compressed air to the minimum required | $558 | $75 |
$376
5,557
kWh
|
$182
-
kW-mo/yr
|
- | |
07 | 2.4151: Develop a repair/replace policy | $262 | $519 |
$240
3,545
kWh
|
$122
-
kW-mo/yr
|
$(-100.0) | |
TOTAL RECOMMENDED | $49,532 | $157,958 |
$34,713
513,650
kWh
|
$16,536
-
kW-mo/yr
|
$(-1,717.0) | ||
TOTAL IMPLEMENTED | $21,125 | $54,258 |
$15,346
227,066
kWh
|
$7,496
-
kW-mo/yr
|
$(-1,717.0) | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs