ITAC Assessment: WV0485
ITAC logo
ITAC Assessment: WV0485
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2014
Principal Product Liquid Silicon, Gaskets, and Seals
NAICS 339991: Gasket, Packing, and Sealing Device Manufacturing
SIC 3053: Gaskets, Packing, and Sealing Devices
Sales Range $10
M
to 50
M
# of Employees 175
Plant Area 177,000
ft2
Annual Production 1,500,000
lb
Production Hrs. Annual 8,760
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $550,520 6,612,000
kWh
Natural Gas $246,060 43,699
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $51,298 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $17,964

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Personnel Changes Savings
01 2.4157: Establish a predictive maintenance program $11,434 $1,000 $13,087
157,112
kWh
- $(-1,653.0)
02 2.1221: Replace obsolete burners with more efficient ones $9,166 $12,500 - $9,166
-
MMBtu
-
03 2.2424: Use heat in flue gases to preheat products or materials $5,371 $10,550 - $5,371
-
MMBtu
-
04 2.2511: Insulate bare equipment $5,211 $2,981 $4,766
57,214
kWh
$445
-
MMBtu
-
05 2.1233: Analyze flue gas for proper air/fuel ratio $4,703 $500 - $5,123
-
MMBtu
$(-420.0)
06 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $3,806 $4,815 $3,806
45,691
kWh
- -
07 2.4231: Reduce the pressure of compressed air to the minimum required $3,038 $175 $3,038
36,465
kWh
- -
08 2.7135: Install occupancy sensors $2,805 $3,000 $2,805
33,675
kWh
- -
09 2.4239: Eliminate or reduce compressed air usage $1,922 $1,719 $1,922
23,077
kWh
- -
10 2.7142: Utilize higher efficiency lamps and/or ballasts $1,635 $4,433 $1,635
19,622
kWh
- -
11 2.4151: Develop a repair/replace policy $1,516 $696 $2,356
28,280
kWh
- $(-840.0)
12 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $691 $426 $691
8,299
kWh
- -
TOTAL RECOMMENDED $51,298 $42,795 $34,106
409,435
kWh
$20,105
-
MMBtu
$(-2,913.0)
TOTAL IMPLEMENTED $17,964 $7,778 $13,656
163,933
kWh
$5,568
-
MMBtu
$(-1,260.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs