ITAC Assessment: WV0457
ITAC logo
ITAC Assessment: WV0457
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2012
Principal Product Pickled Flat Rolled Steel
NAICS 332813: Electroplating, Plating, Polishing, Anodizing, and Coloring
SIC 3471: Electroplating, Plating, Polishing, Anodizing, and Coloring
Sales Range $10
M
to 50
M
# of Employees 30
Plant Area 65,000
ft2
Annual Production 300,000
ton
Production Hrs. Annual 6,624
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $218,012 2,522,400
kWh
Electricity Demand $33,468 4,870
kW-mo/yr
Natural Gas $298,795 49,279
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $46,367 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $21,526

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $14,854 $6,400 $12,985
150,238
kWh
$1,869
-
kW-mo/yr
- -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $11,986 $22,500 $10,475
121,193
kWh
$1,511
-
kW-mo/yr
- -
03 2.1233: Analyze flue gas for proper air/fuel ratio $4,482 $500 - - $4,557
-
MMBtu
$(-75.0)
04 2.1243: Use heat from boiler blowdown to preheat boiler feed water $4,000 $12,251 - - $4,000
-
MMBtu
-
05 2.2511: Insulate bare equipment $2,539 $5,407 - - $2,539
-
MMBtu
-
06 2.4151: Develop a repair/replace policy $2,244 $775 $2,221
25,696
kWh
$323
-
kW-mo/yr
- $(-300.0)
07 2.4157: Establish a predictive maintenance program $2,189 $1,000 $3,109
35,975
kWh
$447
-
kW-mo/yr
- $(-1,367.0)
08 2.7142: Utilize higher efficiency lamps and/or ballasts $1,415 $2,620 $1,120
12,956
kWh
$295
-
kW-mo/yr
- -
09 2.2414: Use waste heat from hot flue gases to preheat $1,194 $150 - - $1,194
-
MMBtu
-
10 2.2437: Recover waste heat from equipment $1,022 $950 $(-135.0)
(-1,558)
kWh
$(-33.0)
-
kW-mo/yr
$1,190
-
MMBtu
-
11 2.4231: Reduce the pressure of compressed air to the minimum required $330 $50 $289
3,343
kWh
$41
-
kW-mo/yr
- -
12 2.7142: Utilize higher efficiency lamps and/or ballasts $112 $305 $98
1,139
kWh
$14
-
kW-mo/yr
- -
TOTAL RECOMMENDED $46,367 $52,908 $30,162
348,982
kWh
$4,467
-
kW-mo/yr
$13,480
-
MMBtu
$(-1,742.0)
TOTAL IMPLEMENTED $21,526 $29,457 $13,873
160,511
kWh
$1,999
-
kW-mo/yr
$7,096
-
MMBtu
$(-1,442.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs