ITAC Assessment: WV0434
ITAC logo
ITAC Assessment: WV0434
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2011
Principal Product Rubber Goods
NAICS 326291: Rubber Product Manufacturing for Mechanical Use
SIC 3061: Molded, Extruded, and Lathe-Cut Mechanical Rubber Goods
Sales Range $10
M
to 50
M
# of Employees 82
Plant Area 135,000
ft2
Annual Production 3,351,453
lb
Production Hrs. Annual 2,450
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $286,321 3,922,800
kWh
Electricity Demand $101,011 15,618
kW-mo/yr
Natural Gas $143,491 16,203
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $60,296 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $29,281

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Liquid (non-haz) Savings Personnel Changes Savings
01 2.2121: Increase amount of condensate returned $23,833 $46,000 - - $15,833
-
MMBtu
$8,000
-
gal
-
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $8,864 $1,234 $6,179
84,659
kWh
$2,685
-
kW-mo/yr
- - -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $6,335 $14,967 $4,310
59,049
kWh
$2,025
-
kW-mo/yr
- - -
04 2.3131: Reschedule plant operations or reduce load to avoid peaks $5,577 $7,840 - $5,577
-
kW-mo/yr
- - -
05 2.4157: Establish a predictive maintenance program $2,984 $4,000 $2,368
32,442
kWh
$1,029
-
kW-mo/yr
- - $(-413.0)
06 2.4151: Develop a repair/replace policy $2,898 $810 $2,722
37,289
kWh
$1,184
-
kW-mo/yr
- - $(-1,008.0)
07 2.2136: Install / repair insulation on steam lines $2,623 $1,025 - - $2,623
-
MMBtu
- -
08 2.2424: Use heat in flue gases to preheat products or materials $2,596 $9,940 - - $2,596
-
MMBtu
- -
09 2.7226: Use computer programs to optimize hvac performance $2,304 $2,105 - - $2,304
-
MMBtu
- -
10 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,304 $3,000 $909
12,454
kWh
$395
-
kW-mo/yr
- - -
11 2.7142: Utilize higher efficiency lamps and/or ballasts $814 - $987
13,524
kWh
$427
-
kW-mo/yr
- - $(-600.0)
12 2.4239: Eliminate or reduce compressed air usage $164 $455 $112
1,540
kWh
$52
-
kW-mo/yr
- - -
TOTAL RECOMMENDED $60,296 $91,376 $17,587
240,957
kWh
$13,374
-
kW-mo/yr
$23,356
-
MMBtu
$8,000
-
gal
$(-2,021.0)
TOTAL IMPLEMENTED $29,281 $29,876 $15,579
213,439
kWh
$12,500
-
kW-mo/yr
$2,623
-
MMBtu
- $(-1,421.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Liquid (non-haz) Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs