Assessment Year | 2012 |
---|---|
Principal Product | Tomato Sauce |
NAICS | 311421: Fruit and Vegetable Canning |
SIC | 2033: Canned Fruits, Vegetables, Preserves, Jams, and Jellies |
Sales Range | $10 M to 50M |
# of Employees | 40 |
Plant Area |
60,000
ft2
|
Annual Production | 17,000,000
units
|
Production Hrs. Annual | 4,420
hrs
|
Location (State) | New York |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $118,976 | 1,132,912 |
kWh
|
$0.11 |
Electricity Demand | $93,825 | 3,302 |
kW-mo/yr
|
$28.41 |
Electricity Fees | $17,172 | - |
|
- |
Natural Gas | $430,105 | 50,699 |
MMBtu
|
$8.48 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $174,693 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $41,523 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Ancillary Material Cost Savings | Water Consumption Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $4,689 | $3,000 | - |
$4,689
-
kW-mo/yr
|
- | - | - | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $5,390 | $13,920 |
$2,998
28,854
kWh
|
$2,217
-
kW-mo/yr
|
- | $175 | - | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $14,612 | $13,428 |
$8,257
78,641
kWh
|
$6,082
-
kW-mo/yr
|
- | $273 | - | |
04 | 2.7135: Install occupancy sensors | $2,652 | $3,590 |
$1,820
17,335
kWh
|
$796
-
kW-mo/yr
|
- | $36 | - | |
05 | 2.7232: Replace existing hvac unit with high efficiency model | $7,198 | $9,800 |
$1,588
15,120
kWh
|
$128
-
kW-mo/yr
|
$4,715
-
MMBtu
|
$767 | - | |
06 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $21,354 | $70,000 |
$12,316
117,291
kWh
|
$9,038
-
kW-mo/yr
|
- | - | - | |
07 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $6,280 | $1,000 |
$3,620
34,475
kWh
|
$2,660
-
kW-mo/yr
|
- | - | - | |
08 | 2.2442: Preheat combustion air with waste heat | $11,007 | $20,000 | - | - |
$11,007
-
MMBtu
|
- | - | |
09 | 2.1233: Analyze flue gas for proper air/fuel ratio | $28,832 | $20,000 | - | - |
$28,832
-
MMBtu
|
- | - | |
10 | 2.2113: Repair or replace steam traps | $13,433 | - | - | - |
$13,433
-
MMBtu
|
- | - | |
11 | 4.652: Replace existing equipment with more suitable substitutes | $59,246 | $10,500 | - | - |
$(-1,580.0)
-
MMBtu
|
- |
$60,826
-
Tgal
|
|
TOTAL RECOMMENDED | $174,693 | $165,238 |
$30,599
291,716
kWh
|
$25,610
-
kW-mo/yr
|
$56,407
-
MMBtu
|
$1,251 |
$60,826
-
Tgal
|
||
TOTAL IMPLEMENTED | $41,523 | $24,228 |
$13,465
128,236
kWh
|
$8,870
-
kW-mo/yr
|
$18,148
-
MMBtu
|
$1,040 | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Ancillary Material Cost Savings | Water Consumption Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs