ITAC Assessment: LE0339
ITAC logo
ITAC Assessment: LE0339
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2012
Principal Product Tomato Sauce
NAICS 311421: Fruit and Vegetable Canning
SIC 2033: Canned Fruits, Vegetables, Preserves, Jams, and Jellies
Sales Range $10
M
to 50
M
# of Employees 40
Plant Area 60,000
ft2
Annual Production 17,000,000
units
Production Hrs. Annual 4,420
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $118,976 1,132,912
kWh
Electricity Demand $93,825 3,302
kW-mo/yr
Electricity Fees $17,172 -
Natural Gas $430,105 50,699
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $174,693 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $41,523

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Ancillary Material Cost Savings Water Consumption Savings
01 2.3131: Reschedule plant operations or reduce load to avoid peaks $4,689 $3,000 - $4,689
-
kW-mo/yr
- - -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $5,390 $13,920 $2,998
28,854
kWh
$2,217
-
kW-mo/yr
- $175 -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $14,612 $13,428 $8,257
78,641
kWh
$6,082
-
kW-mo/yr
- $273 -
04 2.7135: Install occupancy sensors $2,652 $3,590 $1,820
17,335
kWh
$796
-
kW-mo/yr
- $36 -
05 2.7232: Replace existing hvac unit with high efficiency model $7,198 $9,800 $1,588
15,120
kWh
$128
-
kW-mo/yr
$4,715
-
MMBtu
$767 -
06 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $21,354 $70,000 $12,316
117,291
kWh
$9,038
-
kW-mo/yr
- - -
07 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $6,280 $1,000 $3,620
34,475
kWh
$2,660
-
kW-mo/yr
- - -
08 2.2442: Preheat combustion air with waste heat $11,007 $20,000 - - $11,007
-
MMBtu
- -
09 2.1233: Analyze flue gas for proper air/fuel ratio $28,832 $20,000 - - $28,832
-
MMBtu
- -
10 2.2113: Repair or replace steam traps $13,433 - - - $13,433
-
MMBtu
- -
11 4.652: Replace existing equipment with more suitable substitutes $59,246 $10,500 - - $(-1,580.0)
-
MMBtu
- $60,826
-
Tgal
TOTAL RECOMMENDED $174,693 $165,238 $30,599
291,716
kWh
$25,610
-
kW-mo/yr
$56,407
-
MMBtu
$1,251 $60,826
-
Tgal
TOTAL IMPLEMENTED $41,523 $24,228 $13,465
128,236
kWh
$8,870
-
kW-mo/yr
$18,148
-
MMBtu
$1,040 -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Ancillary Material Cost Savings Water Consumption Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs