ITAC Assessment: MS0316
ITAC logo
ITAC Assessment: MS0316
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2007
Principal Product Fuel Tanks
NAICS 332312: Fabricated Structural Metal Manufacturing
SIC 3441: Fabricated Structural Metal
Sales Range $10
M
to 50
M
# of Employees 170
Plant Area 105,000
ft2
Annual Production 20,000
pieces
Production Hrs. Annual 6,240
hrs
Location (State) Mississippi

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $211,333 3,099,520
kWh
Electricity Demand $9,927 7,560
kW-mo/yr
Electricity Fees $95,974 -
LPG $58,571 2,824
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $43,240 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $26,061

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings One-time Revenue or Avoided Cost Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $16,634 $27,365 $14,523
334,473
kWh
$1,865
-
kW-mo/yr
$246 -
02 2.8112: Combine utility meters $15,244 - - - - $15,244
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $9,294 $247 $8,633
210,866
kWh
- $661 -
04 4.231: Purchase equipment instead of leasing $1,523 $1,575 - - - $1,523
05 2.7142: Utilize higher efficiency lamps and/or ballasts $545 $5,264 $403
9,833
kWh
$110
-
kW-mo/yr
$32 -
TOTAL RECOMMENDED $43,240 $34,451 $23,559
555,172
kWh
$1,975
-
kW-mo/yr
$939 $16,767
TOTAL IMPLEMENTED $26,061 $1,822 $8,633
210,866
kWh
- $661 $16,767
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs